Can you still apply js after making ointment for bathroom waterproofing?

Updated on Bathroom 2024-08-20
3 answers
  1. Anonymous users2024-01-24

    JS waterproofing should be before the ointment, if the ointment is made, the js waterproofing will not work. Jane is hungry.

    JS waterproofing is directly applied to the concrete destruction or cement mortar base layer to block the return.

  2. Anonymous users2024-01-23

    It can be applied, but the ointment must be dry thoroughly, otherwise JS is easy to layer.

  3. Anonymous users2024-01-22

    I suggest that you ointment dry and make a hydraulic layer on top of it. In doing JS on top. One can play a role in protecting the asphalt.

    Second, JS is also firmly bonded on the top, and it is not easy to layer. Three also played a role in two guarantees. If you can do it without a two-layer JS, you can do more to thicken the asphalt.

    JS and asphalt were made together at the time, and they were still strong at the time, but after a long time, they were each their own when they soaked in water.

Related questions
2 answers2024-08-20

What do you mean that the house you bought is the first decoration, in fact, whether it is the initial decoration or the rough house has been waterproof, but for the sake of insurance, you have to do a 24-hour closed water test, there is no harm to the floor tiles, the floor tiles are glazed, it's okay, rest assured.

2 answers2024-08-20

Waterproof ointment is rare, bathroom waterproof is a little more painted, such as JS waterproof coating, K11 waterproof coating, acrylic waterproof coating, etc., Chenguang JS waterproof coating has strong adhesion, good waterproof effect, water-based coating, health and environmental protection. JS waterproof coating is relatively good whether it is used for home decoration or tooling, and it can be directly constructed without the need for a clean construction site.

3 answers2024-08-20

If the bathroom is waterproofed with asphalt, it is necessary to remove all the asphalt first, and then expose the cement base surface before construction. >>>More

8 answers2024-08-20

It is best to use a tile adhesive mortar with a waterproof effect for tile pasting. It is also possible to add additives to cement mortar to enhance adhesion for tile pasting. At the same time, it is best to use the thin layer method. >>>More

4 answers2024-08-20

The coating film has no waterproof effect in the case of not being able to resist drying, the role of coating film waterproofing is to overcome rigidity with softness, seal capillary pores and micro-cracks, no matter what the reason is sprinkled with dry ash on the paint that has not dried, it is also wrong, the microscopic view is obvious that the waterproof coating structure is destroyed, and the paint ratio is the same, resulting in a decline in flexibility, not a film, in the waterproof at least 24 hours after the completion of the coating film, the surface is useless. In this case, the landlord has not considered the water storage test 24H, just go into the search Qi to take the next process construction, it is not desirable, the conventional 24 solid wall is not needed 180CM as long as 50CM can be, of course, if the effect is better, the 12CM partition wall is required 180CM height, the wall also needs to be drenched in the water test, dry after the wall paint is painted 5 times, and the last time must be sprinkled with dry cement sand while the paint is painted, and the roughness is built, and the tiles are easy and reliable. The waterproof layer of the bathroom is formed at one time, the overall fortification, and there is no waterproof layer to do after the tiles, which is deceptive.