Can I use the toilet directly after the bathroom is waterproofed and the toilet is installed?

Updated on Bathroom 2024-07-07
9 answers
  1. Anonymous users2024-01-24

    After the bathroom is waterproofed, the toilet is installed, and it can be used directly.

    Go to the hardware and grocery store to buy a set of sealing gaskets for the toilet and a glass glue, go home and turn off the water inlet valve first, then press the toilet flush button to drain the water in the water tank, and then remove the toilet, then clean the junction between the toilet and the ground, first glue the sealing ring, and then apply a circle of glass glue according to the outer diameter of the toilet, and then install the toilet back to its original position.

    If you don't have the ability to do it yourself, it's best to find a professional to do it.

  2. Anonymous users2024-01-23

    Yes, you can. However, if the waterproof layer is a waterproof coating, long-term use will damage the waterproof layer.

  3. Anonymous users2024-01-22

    No, after a long time, the waterproof will be damaged, and the waterproof effect will be lost, and a protective layer should be made, such as cement or tiles.

  4. Anonymous users2024-01-21

    It should be possible, the bathroom already has waterproof measures, such as waterproof concrete or something.

  5. Anonymous users2024-01-20

    If there is a leak, the downstairs will suffer, they will ask you for compensation, and in case of leakage, you use the toilet, there is poop and other water flowing out, and the maintenance personnel are not willing to get it for you.

  6. Anonymous users2024-01-19

    If the waterproof is done, you can use it! What can be the problem, the rest is just aesthetics!

  7. Anonymous users2024-01-18

    1. Recognize famous brands when purchasing: At present, the market is flooded with crooked goods, and a large number of toxic materials that have been eliminated and banned by the state have also poured into people's homes. Ordinary consumers should choose brand products with high visibility, good reputation, high degree of anti-counterfeiting, and international quality system certification.

    2. The waterproof part should be comprehensive: the floor and wall of the bathroom (the height of the return is not less than meters or full of work), the floor and wall of the kitchen and balcony (the height of the return is not less than the meter), all the ground and wall of the first-floor residence (the height of the meter), the ground and all the walls of the basement should be waterproof and moisture-proof.

    Third, the thickness of the waterproof layer should be sufficient: the thickness of the waterproof layer directly affects its waterproof life, if the thickness of the waterproof layer is reduced, it is equivalent to reducing its waterproof life.

    Fourth, the construction process should be meticulous: the joints between the wall and the ground, the yin and yang corners, the water pipes, floor drains and the periphery of sanitary ware and the trench where the hot and cold pipes are laid are the key waterproof parts, and the construction must be meticulous.

    5. Closed water test after completion: After the waterproof construction is completed, seal the door and sewer, store water indoors for 24 hours, and check whether there is a leakage point.

    It is usable if waterproofing is not a problem.

  8. Anonymous users2024-01-17

    For the harmony of you and others! You have to do waterproofing again, so as to avoid future troubles, such as waiting until the floor tiles are installed and there is a leakage, it will be difficult to do. You say that?

  9. Anonymous users2024-01-16

    Also install a floor drain, there is a slope on it.

Related questions
2 answers2024-07-07

This is not possible, generally after the waterproofing is done 2 to three days after there is a period of time The curing period is 5 to 7 days, and it seems that it can only be pasted at this time, which I saw on the Internet.

1 answers2024-07-07

After the bathroom is waterproofed, it must be carefully leaked, and it takes at least 24 hours to observe, and it can not be directly pasted with tiles.

2 answers2024-07-07

To do waterproofing, it is done before pasting tiles.

That is to say, after leveling the floor of the bathroom and padding it to a predetermined height, brush it with waterproof paint, and then start to do a closed water test. >>>More

2 answers2024-07-07

The bathroom sinks without a foot and the sanitary threshold is one foot lower, waterproof must be dry at least full brush twice, waterproof and dry after the water is checked in the bathroom for 48 hours and 72 hours, the sewage pipe is not - a pipe, he will not be full of brush (1 meter 2 to 1,5 meters) to buy a commercial house, don't be afraid not to close the trouble waterproof can not directly paste tiles, Wei Xianjian I said that I have to brush twice, on the sand dry can be tiled. Waterproof must be fully brushed, do not stick tiles on the anti-top.

2 answers2024-07-07

After the bathroom is waterproofed, you can do the closed water test after the waterproof layer is completely dry, the closed water test time is generally 48-72 hours, and the closed water test is completed after the ground is dry, and you can use it normally after two days after the brick.