Can the bathroom be tiled directly after waterproofing?

Updated on Bathroom 2024-05-15
1 answers
  1. Anonymous users2024-01-23

    After the bathroom is waterproofed, it must be carefully leaked, and it takes at least 24 hours to observe, and it can not be directly pasted with tiles.

Related questions
2 answers2024-05-15

The bathroom sinks without a foot and the sanitary threshold is one foot lower, waterproof must be dry at least full brush twice, waterproof and dry after the water is checked in the bathroom for 48 hours and 72 hours, the sewage pipe is not - a pipe, he will not be full of brush (1 meter 2 to 1,5 meters) to buy a commercial house, don't be afraid not to close the trouble waterproof can not directly paste tiles, Wei Xianjian I said that I have to brush twice, on the sand dry can be tiled. Waterproof must be fully brushed, do not stick tiles on the anti-top.

3 answers2024-05-15

It's relatively easy to do it yourself.

First: ground leveling is the uneven place needs to be leveled, so as to save the amount of waterproof mortar and ensure waterproofing. >>>More

2 answers2024-05-15

The color difference of tiles is directly related to the decoration effect. It is not a batch of products, or the same batch may produce color difference, therefore, in the purchase process, each packaged product should be sampled and compared, and the tiles should be placed in the same variety and the same model of bricks, and the degree of color difference should be observed.

2 answers2024-05-15

It is best not to tile before the waterproof is dry; It is mainly worried that the cement behind the tile will stick the waterproof layer to the point of destruction; >>>More

2 answers2024-05-15

To do waterproofing, it is done before pasting tiles.

That is to say, after leveling the floor of the bathroom and padding it to a predetermined height, brush it with waterproof paint, and then start to do a closed water test. >>>More