How to repair the bathroom waterproof and broken

Updated on Bathroom 2024-07-07
3 answers
  1. Anonymous users2024-01-24

    If it's the ground, you have to redo the bricks, and if it's a joint, you can re-apply paper tape and re-unscrew it!

  2. Anonymous users2024-01-23

    Knock the bad part wider and then make it waterproof.

  3. Anonymous users2024-01-22

    1. Cracks in rubber concrete;

    2. Use of bad waterproof materials (cheap but not good);

    3. The waterproof layer is not made according to the requirements or the thickness of the waterproof layer is not enough (>;

    4. When doing waterproofing, the base surface does not meet the requirements, and there are phenomena such as sand and looseness.

    5. After the waterproof layer is done, the waterproof layer (veneer brick) is destroyed in the subsequent process;

    6. Decoration slotted buried pipe destroys the original waterproof layer and causes water leakage;

    The material purchase of toilet waterproof practice resolutely puts an end to toilet leakage.

    The waterproofing materials currently on the market are divided into two main categories:

    1. Polyurethane waterproof coatings: polyurethane waterproofing used to be the main waterproof performance of the waterproof market, but now it is basically eliminated because it is not environmentally friendly.

    2. Polymer cement-based waterproof coatings: Polymer cement-based coatings have become the protagonists of the waterproof coating market. At present, cement mortar, as one of the emerging waterproof materials, is a fairly popular hot material.

    General-purpose waterproof materials are generally recommended for kitchen and bathroom waterproofing. Acrylic is the earliest and largest application of waterproofing materials on environmentally friendly paints and coatings.

    Waterproofing construction of toilet waterproofing practices.

    1. Before construction, determine the design of the water circuit, and consider the possibility, feasibility and availability of the design scheme in detail. Lay the water, electricity and heating pipes first, and then level.

    2. During the construction of the base layer, the ground should be flattened with cement mortar first, and then waterproof treatment should be done to avoid leakage caused by uneven thickness of the waterproof coating. When paving, it should be painted evenly, and there can be no leakage, bulging and falling off, and attention should be paid to the waterproof dead corners during construction, the joints between the wall and the ground, and the joints between the water and water pipes and the ground.

    3. After the construction of the waterproof layer, carry out a flooding inspection, block all the sewers, build a 25cm high barrier at the door, and then pour 20cm high water into the bathroom. After 24 hours, check whether there is leakage on the surrounding walls and ground, if there is leakage, it needs to be repaired in time, and then do a 24-hour water test without leakage before entering the next stage of construction.

    4. After the protective layer of cement mortar is dry, you can pave the wall tiles or spray paint or pave the wallpaper on it to carry out normal decoration. Recommended article: Renderings of new house decoration.

    Entrance hallway decoration renderings.

    120 square meters of decoration renderings 60 square meters of decoration renderings.

    80 square meters of decoration renderings.

    Renderings of three bedrooms, two living rooms and two bathrooms.

Related questions
5 answers2024-07-07

Answer 1: If the bathroom uses sewing agent, you need to use a utility knife to make a groove in the gap; 2. Use a penetrating waterproof agent to evenly apply it to the cement; 3. After the waterproofing agent is dry, fill the gaps with caulk; 4. Use plastic steel mud to make waterproof edges on the connection of the wall and the ground and the pipeline; 5. Do not touch the water within one day after the end of the project. Ask questions.

1 answers2024-07-07

If the line fails, for example, the line is burned out and can be repaired, if the whole is burned out, and the material is burned out of shape, the cost of this repair is better than buying a new one.

3 answers2024-07-07

The fourth method is to repair the glass according to the degree of damage. If the glass on the glass door is only cracked and not broken, it can actually be fixed by a protective film to strengthen the cracked glass and cover up the cracks. Nowadays, there are many frosted types of glass films on the market, you only need to choose the appropriate glass film to cut the size and stick it directly on the glass door glass.

2 answers2024-07-07

First of all, it is enough to buy a good water valve with the same specification as the original water valve, and then remove the bad valve when the water source and power are turned off, and then install the new valve in the original position.

4 answers2024-07-07

The waterproof layer was broken, and it was determined to be redone. >>>More