Is the bathroom doored or tiled first?

Updated on Bathroom 2024-10-06
9 answers
  1. Anonymous users2024-01-24

    The bathroom must be tiled first. After the tiles are laid, the bathroom door is customized according to the height of the floor. Otherwise, just in case.

    If the tiles are paved or high, the door will not open!

  2. Anonymous users2024-01-23

    When decorating a house, it is common to install doors first and then lay tiles. Renovation can generally be carried out by following these steps:

    Week 1: Commencement procedures, self-measurement, pre-design and budgeting.

    The second week: the main body is demolished, the wooden door manufacturer comes to measure, and the cabinet is measured for the first time.

    Week 3: Plumbing renovation, waterproofing of toilets.

    Week 4: Carpentry of the main ingredients.

    Week 5: Tiling (installation of window sills, floor drains), installation of sleeve hood machine cabinets for the second measurement.

    Week 6: Painting the walls and ceilings in the kitchen and bathroom.

    Week 7: Gas and cabinet installation (sink and gas stove installed at the same time).

    Week 8: Wooden door installation, floor installation, wallpaper installation (radiator installation).

    Week 9: Switch and socket installation, lamp installation, hardware and sanitary ware installation, window pole installation, pioneer cleaning.

    Week 10: Furniture Arrival, Home Appliance Installation, Home Accessories, Moving.

    Door installation must be planned and measured in advance, because it can take up to a month to customize the door. Follow the steps above to install the door and tile the floor at the eighth week, so as to avoid damage and contamination of the tiles. There are several issues that need to be paid attention to in floor installation:

    1. Before the floor is installed, let the manufacturer come to the door to survey whether the ground needs to be leveled or partially leveled.

    2. Before the floor is installed, the ground should be cleaned and dry. On the second day of floor installation, you can make an appointment with wallpaper to pave. It is recommended that on the day of wallpapering, the floor should be protected first.

  3. Anonymous users2024-01-22

    The bathroom must be tiled first. After the tiles are laid, the bathroom door is customized according to the height of the floor. Otherwise, if the tiles are raised high, the door will not open!

  4. Anonymous users2024-01-21

    First tiles, then door frames, and finally doors.

  5. Anonymous users2024-01-20

    It is recommended to first doors and windows, and it is not easy to make mistakes in closing efforts, and the tiles are easy to adjust. Look].

  6. Anonymous users2024-01-19

    It is basic common sense that the bathroom should be tiled first and then the door should be installed.

  7. Anonymous users2024-01-18

    Install the door frame - door - tile first.

  8. Anonymous users2024-01-17

    First: If it is a wooden door, it is necessary to paste the brick first and then install the door cover and door, so that the edge is better and more beautiful.

    Second: is an aluminum alloy door or a plastic steel door, it is necessary to install the door first and then paste the brick, because the aluminum alloy and plastic steel door is a relatively simple door, it only has the door frame without the door sleeve, and the edge of the brick can not be closed, so it is necessary to install the door first and then paste the brick door edge to look good. If it is a wooden door, it is necessary to paste the brick first and then install the door cover and door, so that the edge is better and more beautiful; If it is an aluminum alloy door or a plastic steel door, it is necessary to install the door first and then paste the brick.

    Aluminum alloy and plastic steel door is a relatively simple door, it only has the door frame without the door sleeve, can not close the edge of the brick, so it is necessary to install the door first and then paste the brick door edge to look good.

  9. Anonymous users2024-01-16

    Generally, tiles are installed first, and the door frame can also be wrapped with wall tiles in the later stage.

Related questions
4 answers2024-10-06

The bathroom must be tiled first and then installed with a toilet. . . >>>More

1 answers2024-10-06

Bathroom, kitchen: bathroom and tile are two more serious water vapor space, we need to paste wall tiles and floor tiles first, these important foundation works after the completion of the ceiling, otherwise the joints are not properly handled, the later stage is also very troublesome, but also will affect the overall visual enjoyment.

2 answers2024-10-06

The decoration of the bathroom is like this, if it is a hard package of exhaust and drainage pipes, first wrap the pipes, and then pave the ground with sand and cement mixture, do membrane waterproofing on top, after the water seepage experiment, start to measure the vertical horizontal line to pave the wall tiles, and pave the floor tiles. The bricklayer is finished, and the carpentry works are carried out on the ceiling. Only in this order.

1 answers2024-10-06

Hello, the bathroom decoration is first bricked in the door, because after the bricks are pasted, you can know that you actually know the special height size, and it is also more beautiful.

1 answers2024-10-06

After the tiles are paved first, the installation, commissioning, fixing and use of the finished toilet are carried out; >>>More