Whether the bathroom is tiled or suspended first

Updated on Bathroom 2024-04-18
1 answers
  1. Anonymous users2024-01-23

    Bathroom, kitchen: bathroom and tile are two more serious water vapor space, we need to paste wall tiles and floor tiles first, these important foundation works after the completion of the ceiling, otherwise the joints are not properly handled, the later stage is also very troublesome, but also will affect the overall visual enjoyment.

Related questions
2 answers2024-04-18

The decoration of the bathroom is like this, if it is a hard package of exhaust and drainage pipes, first wrap the pipes, and then pave the ground with sand and cement mixture, do membrane waterproofing on top, after the water seepage experiment, start to measure the vertical horizontal line to pave the wall tiles, and pave the floor tiles. The bricklayer is finished, and the carpentry works are carried out on the ceiling. Only in this order.

4 answers2024-04-18

The bathroom must be tiled first and then installed with a toilet. . . >>>More

2 answers2024-04-18

Do waterproofing first. Then lay the floor tiles.

1 answers2024-04-18

First make floor heating and then make tiles for kitchen and bathroom.

1 answers2024-04-18

Lay the floor tiles first, and then scrape the walls with latex paint. It is enough to protect the ground with colorful cloth.