What are the key precautions for the installation of sanitary partitions?

Updated on Bathroom 2024-04-18
2 answers
  1. Anonymous users2024-01-23

    1. After laying floor tiles and wall tiles, then make a sanitary partition wall When decorating the bathroom, the floor tiles and wall tiles should be paved first, and then the sanitary partition wall should be customized according to the actual required size. Note that before laying floor tiles, sewer pipes and floor drains must be installed, and at the same time, the possible errors on the upper and lower walls should be considered, and the glass doors should be customized according to the actual size to install and use. 2. Consider the water repellency of the door frame threshold Consider whether the glass partition of the bathroom has a door frame to block water, if not, it is necessary to install a special threshold stone, and the general threshold stone should be higher than the ground, otherwise the shower water flows out from under the door, and it cannot achieve the purpose of dry and wet partitioning, which is easy to cause inconvenience.

    Be careful not to use the slide, because the water and dust in the slide are difficult to clean and will stink after a long time. 3. Hand rods should be installed on the side of the bathtub The bathtub in the bathroom is a place where the whole family members need to take a bath, and there are water, shower gel and other risk factors in the bathroom that are easy to cause slippage, so in order to ensure safety, it is best to install a hand rod on the side of the bathtub, especially if there are elderly and children at home, it is necessary to pay more attention to this detail. 4. The electrical plug should be kept away from the bathtub The bathtub is a container for water storage, and it is best not to have electrical plugs around, because under normal circumstances, many people will dry their hair in the bathroom by the way after washing their hair.

    5. Do a good job of moisture-proof measures for switching power supply The bathroom should be the water base at home, so in order to ensure safety, the bathroom must be planned to use a pull-wire switch when decorating, and its power socket and other energized equipment should also be equipped with moisture-proof covers. 6. The glass door should be made of organic or tempered glass The glass door of the shower room should be made of plexiglass or tempered glass to avoid hurting people. If the glass is colorless, it is best to apply the pattern at a fairly eye level to avoid breaking the glass.

  2. Anonymous users2024-01-22

    Precautions for the installation process of sanitary partitions:

    1.Before laying floor tiles, install sewer pipes and floor drains.

    2.Before making partitions, it is necessary to lay floor tiles and wall tiles, and then make sanitary partitions according to the actual size of the partition, because there may be errors up and down the wall, and the partition made according to the actual size is easy to install and use.

    3.If there is no door frame, a sill stone should be installed to block the flow of water.

    4.Try not to use the slide, because the water and dust in the slide are difficult to clean, and it will be clogged and stinky over time.

Related questions
3 answers2024-04-18

1. After laying floor tiles and wall tiles, then make a sanitary partition wall When decorating the bathroom, the floor tiles and wall tiles should be paved first, and then the sanitary partition wall should be customized according to the actual required size. Note that before laying floor tiles, sewer pipes and floor drains must be installed, and at the same time, the possible errors on the upper and lower walls should be considered, and the glass doors should be customized according to the actual size to install and use. 2. Consider the water repellency of the door frame threshold Consider whether the glass partition of the bathroom has a door frame to block water, if not, it is necessary to install a special threshold stone, and the general threshold stone should be higher than the ground, otherwise the shower water flows out from under the door, and it cannot achieve the purpose of dry and wet partitioning, which is easy to cause inconvenience. >>>More

2 answers2024-04-18

We also have to understand according to our construction, but such a size also depends on the construction situation on site. So we also have to think about the back aspect. The higher partition door is about 2m, and the partition floor of the bathroom should be made of waterproof, dirt-resistant, non-slip granite, etc., and its height size should be 10-20mm lower than that of other grounds. >>>More

1 answers2024-04-18

First, the installation method:

After smashing the original wall, first level the top and bottom with cement next to the corner line. Then use the aluminum profile with grooves to fix the expansion screws according to the size of the wall, then put the glass, and finally use waterproof glass glue to coat all the places with gaps and joints to waterproof. >>>More

2 answers2024-04-18

Punch holes in the ceiling and the wall first, and the distance of the holes is determined by the size of the area. This hole is used to hang expansion screws, the position of this hole is very important, it can be said to carry the weight of the overall ceiling. In general, the size of the hole depends on your area, and you can consult this at the place where you buy materials. >>>More

1 answers2024-04-18

Step 1: Install the fixing plate.

Find a suitable position on the wall to draw the center line of the fixing piece, see how many screw holes are fixed on the fixing plate, and then punch a few holes on the center line of the wall, put the plastic race sleeve into the hole, and then use the expansion wire to fix the fixing plate on the wall. >>>More