Do waterproofing first. Then lay the floor tiles.
-
ma of more days and months and years t
According to the specification, it should be prefabricated in the floor base layer of the water barrier, and then waterproof construction, the waterproof layer needs to be turned over the water barrier, and then the water barrier is installed on the water barrier, and finally the bricks are paved, so as to ensure that the water in the shower area will not seep out. >>>More
First make floor heating and then make tiles for kitchen and bathroom.
Of course, the floor drain is installed first, and try to choose a good quality anti-odor floor drain.
First the wall, then the ground. Because there is a floor drain in the bathroom, if you want to do the slope, you should do the ground first, and the wall tiles will not be flat.
The bathroom and kitchen are all water and electricity first, put the water pipes and electric pipes in place, and then brush the waterproof paint, and then start to lay floor tiles. Finally suspended ceilings.