-
First the wall, then the ground. Because there is a floor drain in the bathroom, if you want to do the slope, you should do the ground first, and the wall tiles will not be flat.
-
It should be ground first and then the wall, because after the waterproofing is done, it is easy to destroy the waterproofing if you step on it, so it should be ground first and then the wall.
-
Lay the wall tiles first, and make the bathroom waterproof before sticking to the floor tiles without interfering with each other.
In general, the ceiling is suspended first, and then the floor tiles are laid. The ceiling is carpentry work, and the garbage and dust are very large, even if the bricks are paved and protected with adhesive tape, it is not ideal, and it is difficult to take care of; >>>More
First make floor heating and then make tiles for kitchen and bathroom.
Kitchen renovation must be done with floor tiles before cabinetry can be installed. >>>More
Depending on the room, the order of tiling or ceiling is different. >>>More
When cutting the sewer pipe, you need to leave the thickness of the layup.