How deep is the waterproof layer of the bathroom building from the ground? Where is the pipe to be s

Updated on Bathroom 2024-09-09
4 answers
  1. Anonymous users2024-01-24

    Generally, it is meters, the position of the shower is meters, and the root of the pipe is the place where the ground and the pipe are in contact.

  2. Anonymous users2024-01-23

    Normal 800mm height is enough for the position of the shower to do width * height.

    The root of the pipe is the junction of the original embedded pipe and the original building floor, where it is brushed several times for waterproofing.

    The water trapping test should be done conscientiously, and after it is done, it is necessary to go downstairs to observe it carefully.

  3. Anonymous users2024-01-22

    Some are made directly on the surface, and some have a little protective layer, but not more than one centimeter! It should be the best to dig to the contact between the original waterproof layer and the pipe root, or the structural concrete floor slab! More information, better advice, free professional technical consultation on concrete waterproof leakage repair, free of the trouble of repairing today, leaking tomorrow, repairing every year, and leaking every year.

  4. Anonymous users2024-01-21

    Generally, the wall is painted 30 inside high; The bathing area is painted to a height of a meter or a width to the top; The thickness of the waterproof layer does not exceed 2 mm.

    The root of the pipe refers to the junction between the pipe and the floor slab of the building structure.

    Leibangshi - home waterproofing expert.

Related questions
1 answers2024-09-09

You're an intern, it's naïve, you've stepped out of school, you should understand what you're going to learn. >>>More

6 answers2024-09-09

1. Inspect and accept the appearance, variety, specification, packaging, size and quantity of materials, and form corresponding acceptance records. >>>More

10 answers2024-09-09

1. Inspect and accept the appearance, variety, specification, packaging, size and quantity of materials, and form corresponding acceptance records. >>>More

1 answers2024-09-09

Please show a larger picture, only this one can't see clearly.

1 answers2024-09-09

Then it is better to continue to use SBS coil. Is it black polyurethane paint?