How to do waterproofing for home improvement bathroom?

Updated on Bathroom 2024-09-09
4 answers
  1. Anonymous users2024-01-24

    How to do a good job of waterproofing the bathroom.

    Construction method: section.

    First, deal with the base surface (substrate) of the waterproof position. The base surface is treated into a firm, flat and clean surface, free of dust, greasy, wax and other debris substances; If there are pores, cracks and unequal defects on the base surface, it must be repaired and smoothed with cement mortar in advance, plastic strips are recommended to be pasted on the expansion joints, a layer of non-woven fabric must be added to the node, and the nozzle filling is recommended to use Leibangshi plugging king or nozzle grout; The corners of the wall should be plastered into an arc shape (or V-shaped); Make sure the base surface is sufficiently wet, but there is no open water;

    Second, pay attention to the waterproof construction in place. : Brush directly on the base surface with a brush or roller brush, the strength is used evenly, and the brush should not be missed; Generally, it needs to be brushed twice (according to the requirements of use), and the thickness of each brush should not exceed 1mm; After the previous one is slightly dry, the next one is brushed (just non-sticky, generally at an interval of 1-2 hours), and the front and rear vertical cross brushing, the total thickness of the brush is generally 1-2mm; If the coating has already cured, moisten it with water first when applying another layer. Special attention should be paid to the corner part of the wall to be treated into an arc type and then painted, and the painting can not be too thick (the total thickness does not exceed 2); The pipe should be sleeved with a casing, and the holes of the casing and the wall should be filled with a plugging king, and the waterproof material should be brushed to the height of the casing 10 and not too thick;

    Clause. 3. Pay attention to the position and height of the waterproof painting. Ground; Generally, the wall is repainted and brushed 30 high; Paint the wall around the shower area 180 high or to the top of the wall; There is a bathtub where the upper brush is 30 higher than the bathtub.

    Clause. Fourth, do a good job of water test. After the waterproof coating is painted to form a waterproof layer (about 24 hours later), the water storage is 20 high, and after 24 to 48 hours, see if the water is significantly reduced or go downstairs to see if there is a wet water point on the roof, and if not, it means that the waterproof construction is qualified.

    If you do the above points completely, you will be able to achieve the waterproof energy of the bathroom without any "wet".

    In the case of general labor and materials on the market, depending on the economic development area, it is about 45 yuan to 55 yuan per square meter.

  2. Anonymous users2024-01-23

    First of all, find a professional waterproof master, pay attention to the ground before painting, clean and clean, so as to avoid uneven painting and water seepage, they will deal with it, and do a 24-hour airtight experiment after painting to see if there is water leakage. When painting, the root of the pipe must be carefully painted to prevent water seepage, and pay attention to the details of the corner of the wall. When buying products, buy the kind of medium and high-end products that are breathable and impermeable.

    You tell him about the family.

  3. Anonymous users2024-01-22

    The material cost is about 300 500 yuan, and the labor is different in various places, and the painting area is 4 6 square meters; The material of 300 yuan is generally water-based paint, JS, acrylic, and 500 yuan is generally one-component polyurethane coating, which is available in major building materials supermarkets.

  4. Anonymous users2024-01-21

    If you do waterproofing yourself, you can buy waterproof money, and find someone to do the contractor and package materials for about 1500.

Related questions
4 answers2024-09-09

The waterproofing of the home bathroom is relatively simple, and it is OK to brush the waterproof paint directly. >>>More

9 answers2024-09-09

How do you make a bathroom waterproof? Let's find out.

Bathroom waterproofing needs to be painted with waterproof paint twice, the first waterproof coating needs to ensure that it is firmly combined with the base layer, and then brush the second time after the first paint is dry, and then carry out a closed water experiment after completing the brushing, and observe that there is no leakage before it is completed. >>>More

6 answers2024-09-09

1. Inspect and accept the appearance, variety, specification, packaging, size and quantity of materials, and form corresponding acceptance records. >>>More

1 answers2024-09-09

To do a good job of ground waterproofing: before laying floor tiles, we must do a good job of waterproofing engineering; After the tile is laid, it is necessary to ensure that the brick surface has a drainage slope (generally about 1% is appropriate), and the slope is towards the floor drain, which is conducive to wastewater discharge. >>>More

6 answers2024-09-09

1.The waterproof layer of the kitchen, the ground is all waterproof, the wall is 30 cm high, and the waterproof of the water, such as the dishwasher, shall not be lower than the water range. >>>More