Sanitary partition, do sliding door, whether to install the integrated ceiling door first, or instal

Updated on Bathroom 2024-09-18
2 answers
  1. Anonymous users2024-01-24

    Suspend the ceiling first, and then install the partition door. In this way, the problem of uneven partition door and poor connection of the ceiling can be avoided. I hope my answer can help you.

  2. Anonymous users2024-01-23

    Just do it at 1.8 meters.

Related questions
1 answers2024-09-18

Install the integrated ceiling first, and then install the partition door according to the space left. In this way, the ceiling is a whole, and the problem of poor connection between the ceiling and the partition is also avoided. I hope my answer can help you.

6 answers2024-09-18

It must be the partition to be fixed first, and then add the fiber layer plastering, this lightweight wall is then waterproof to do the top, the underground joints should be wiped with toughness waterproof coating and fiber layer treatment, and then fully painted waterproof, 24 hours after the water to do the closed water experiment, observe 24 to 48 hours If there is no problem, use tile adhesive to paste the tiles, otherwise it is easy to empty the bricks! It's so detailed, and I don't give it points???

2 answers2024-09-18

Swing doors are better than sliding doors, with better sealing and sound insulation, which everyone knows; It is conceivable that the bathroom is a smelly place, and the most experienced thing is that if it is a sliding door, the size of the sound of flushing at the end of the squatting toilet can be heard in the living room is related to the door, and the sealing of the odor is more related to the door; >>>More

3 answers2024-09-18

If it is a partition wall, it is necessary to make the wall first, and then the ceiling. If it is a movable partition (push-pull partition, glass partition, plastic steel partition, etc.), you can make a ceiling first, and then a partition.

1 answers2024-09-18

First of all, you have to figure out that the partition and the door are two things, its role and function are different, it is recommended to use a hanging partition, the durability of the water retaining and rail is better in all aspects.