Is the toilet partition tiled or partitioned first?

Updated on Bathroom 2024-09-01
6 answers
  1. Anonymous users2024-01-24

    It must be the partition to be fixed first, and then add the fiber layer plastering, this lightweight wall is then waterproof to do the top, the underground joints should be wiped with toughness waterproof coating and fiber layer treatment, and then fully painted waterproof, 24 hours after the water to do the closed water experiment, observe 24 to 48 hours If there is no problem, use tile adhesive to paste the tiles, otherwise it is easy to empty the bricks! It's so detailed, and I don't give it points???

  2. Anonymous users2024-01-23

    One is that there is a water retaining stone. Insert into the ground at the same time as the rotation is close to the ground. Beautiful and holistic.

    The second is acrylic. After pasting the bricks, put them directly on the ground to glue.

    The third is a brick partition, which needs to be carried out at the same time as bricking.

    To be precise, the partition should be installed after the bricks are pasted.

  3. Anonymous users2024-01-22

    Hello

    Communicate with the decoration master more, be sure to communicate on both sides in place, and the actual situation of each family will be different.

  4. Anonymous users2024-01-21

    First do the partition, generally use 75 light steel keel + cement pressure plate, and then hang the net plastering, and then do waterproofing, closed water test, brushing and pasting tiles.

  5. Anonymous users2024-01-20

    Partition first, because it needs to be waterproof.

  6. Anonymous users2024-01-19

    One is that there is a water retaining stone. Insert into the ground at the same time as the rotation is close to the ground. Beautiful and holistic.

    x0d x0a to be precise, the partition should be installed after the bricks are pasted.

Related questions
1 answers2024-09-01

Hang the ceiling handle first? The middle partition door is marked and reserved space, and the decoration is generally up and down first.

2 answers2024-09-01

If you don't do waterproofing first, the gap between the partition and the ground will leak later, so be sure to do waterproofing first.

5 answers2024-09-01

Waterproofing must be done before tiling.

The main reasons are: >>>More

3 answers2024-09-01

If it is a partition wall, it is necessary to make the wall first, and then the ceiling. If it is a movable partition (push-pull partition, glass partition, plastic steel partition, etc.), you can make a ceiling first, and then a partition.

1 answers2024-09-01

Paste the bricks first, and the cabinets should be on the wall tiles, floor tiles, and the ceiling will be completed before entering the site.