When budgeting for indoor home decoration, do you have to budget for the plumbing of the bathroom?

Updated on Bathroom 2024-09-09
5 answers
  1. Anonymous users2024-01-24

    Of course, it needs to be done, but the sewage pipeline is generally not moving, and the water is measured on site, and the direct cost that can be generated is the cost of the pipeline, that is, the cost of bricks, cement and labor, and the bricklayer needs to be tiled after the pipeline.

  2. Anonymous users2024-01-23

    Definitely do it, and ask you in turn, don't you think this pipe is exposed in your bathroom when you decorate? Do you think it is convenient for the master bricklayer to put bricks behind the pipe when he is laying tiles? This work is vulgar:

    Assure. Wrap the tube. It is not an eyesore, and it is also convenient for bricklayers to be tiled.

    When pasting tiles, this is considered a tip, and you have to overcharge for work. It's none of your business. When quoting, it is said:

    Guaranteed, 100 yuan? 150?Just ask your company how to quote the price.

  3. Anonymous users2024-01-22

    That piece belongs to the hydropower renovation, this piece belongs to the hidden project, which is a very important piece of home improvement, and the amount of work is not good budget. Many renovation companies are separated from the budget, and the renovation is completed and the owner accepts the quantity of the project. In this way, the owner needs to understand the quotation of the decoration company for water and electricity renovation in advance, and must have a bottom in mind to avoid disputes in the future.

  4. Anonymous users2024-01-21

    If you want to seal the tube, you have to do it. It is also necessary to connect from the toilet to the sewage pipe, and the workers also have to collect money.

  5. Anonymous users2024-01-20

    If the restroom does not alter the plumbing or add additions, it is possible not to budget.

Related questions
1 answers2024-09-09

1. I don't know which bathroom sanitary ware you are talking about, generally there is a washbasin 50CM high from the ground, a comprehensive bath switch of 1M, a faucet 80CM high, a flush tank halter of 50CM, and a water heater.

7 answers2024-09-09

Construction Method: Section.

First, deal with the base surface (substrate) of the waterproof position. The base surface is treated into a firm, flat and clean surface, free of dust, greasy, wax and other debris substances; If there are pores, cracks and unequal defects on the base surface, it must be repaired and smoothed with cement mortar in advance, plastic strips are recommended to be pasted on the expansion joints, a layer of non-woven fabric must be added to the node, and the nozzle filling is recommended to use Leibangshi plugging king or nozzle grout; The corners of the wall should be plastered into an arc shape (or V-shaped); Make sure the base surface is sufficiently wet, but there is no open water; Second, pay attention to the waterproof construction in place. : Brush directly on the base surface with a brush or roller brush, the strength is used evenly, and the brush should not be missed; Generally, it needs to be brushed twice (according to the requirements of use), and the thickness of each brush should not exceed 1mm; After the previous one is slightly dry, the next one is brushed (just non-sticky, generally at an interval of 1-2 hours), and the front and rear vertical cross brushing, the total thickness of the brush is generally 1-2mm; If the coating has already cured, moisten it with water first when applying another layer. >>>More

4 answers2024-09-09

When choosing cement-based waterproofing products, 1 square layer can be made per kilogram, and 2 layers need to be made, that is to say, 2 layers need 2 kilograms of cement-based waterproofing products per square meter. The bathroom should be meters high according to the regulations, and the practice shows that the wall area is about equal to the ground area. >>>More

8 answers2024-09-09

When budgeting, the waterproof area of the bathroom and kitchen is calculated according to the ground area + wall area, of which the bathroom wall area is, the perimeter is multiplied by meters, the kitchen wall area is, the perimeter is multiplied by meters, and then the area occupied by the doors and windows is deducted.

3 answers2024-09-09

This problem is not easy to solve, otherwise the cost is too great, you can install a circulating pump to circulate the water under management, so that as long as the water in the solar energy is hot, then the water in the tube is hot.