Do you want to lay the kitchen and bathroom first, or the floor tiles in the living room and bedroom

Updated on Kitchen 2024-09-14
5 answers
  1. Anonymous users2024-01-24

    The kitchen and bathroom are laid first and the floor tiles in the living room and bedroom are laid first, so you don't have to distinguish so clearly where the first shop is the same, the only main thing is.

    You must first determine the thickness of the tiles in each room, and the floor of the living room and bedroom must be higher than the kitchen and bathroom.

  2. Anonymous users2024-01-23

    The living room should be paved first, and the floor tile joints are easier to deal with.

    When you come in at the main entrance, you should have a straight porcelain.

  3. Anonymous users2024-01-22

    Normally, the kitchen and bathroom should be paved first, because the floor tiles in the living room and bedroom are not the same as the kitchen and bathroom!

  4. Anonymous users2024-01-21

    First the kitchen, then the living room and bedroom, then the bathroom.

    Master it yourself, and generally put the place that is least afraid of pollution last.

  5. Anonymous users2024-01-20

    My house is the bathroom first, then the living room, and then the kitchen.

Related questions
1 answers2024-09-14

Bathroom, kitchen: bathroom and tile are two more serious water vapor space, we need to paste wall tiles and floor tiles first, these important foundation works after the completion of the ceiling, otherwise the joints are not properly handled, the later stage is also very troublesome, but also will affect the overall visual enjoyment.

7 answers2024-09-14

Of course, the floor drain is installed first, and try to choose a good quality anti-odor floor drain.

2 answers2024-09-14

The decoration of the bathroom is like this, if it is a hard package of exhaust and drainage pipes, first wrap the pipes, and then pave the ground with sand and cement mixture, do membrane waterproofing on top, after the water seepage experiment, start to measure the vertical horizontal line to pave the wall tiles, and pave the floor tiles. The bricklayer is finished, and the carpentry works are carried out on the ceiling. Only in this order.

4 answers2024-09-14

The bathroom must be tiled first and then installed with a toilet. . . >>>More

2 answers2024-09-14

Bathroom tile paving is to pave the wall tiles first, but when paving the wall tiles, it is necessary to reserve the bottom circle of wall tiles not to pave. However, it should be noted that the horizontal line needs to reach the level before the wall tiles can be paved upwards. After the tiles above the wall are paved, the floor tiles are paved, and then the bottom circle of wall tiles is paved to complete.