Bathroom waterproofing is done before or after squatting installation

Updated on Bathroom 2024-09-11
3 answers
  1. Anonymous users2024-01-24

    Toilet waterproofing should be done before the installation of the squatting toilet, not after the installation of the squatting toilet.

    The drain of the toilet is inserted into the inside of the sewer pipe and has nothing to do with draining.

  2. Anonymous users2024-01-23

    It is best to do double waterproofing, one layer before the installation of the squatting toilet and one layer after the installation is completed.

  3. Anonymous users2024-01-22

    Toilet waterproof operation practices:

    Ground treatment. Before waterproofing, be sure to level the ground, if the ground is uneven, it may affect the effect of waterproofing, and may also cause cracking and leakage caused by uneven thickness of waterproof coating. Floor drains, wall corners, pipe heels and other joints should be painted with high elasticity and flexible waterproofing, because the joints between the wall and the floor of the bathroom will be displaced, and water seepage is most likely to occur.

    wall treatment. If the bathroom has a shower room, the waterproof should be 180cm, and if there is a bathtub, the waterproof height of the wall adjacent to the bathtub should be 30cm higher than the bathtub.

    After the waterproof layer is done, a certain amount of time should be left to make the waterproof layer better integrated with the building, and then the protective layer on the waterproof layer and then paved with floor tiles.

    Waterproof construction is a concealed project, the follow-up construction may also damage the waterproof layer, if the floor tiles have been laid, do not smash the floor tiles, with professional joint waterproof materials, all the gaps are blocked to do a good job of waterproofing. It is also suitable for waterproofing projects after the failure of the waterproof layer in the bathroom.

Related questions
2 answers2024-09-11

Of course, the bathroom is to do the level first, level the base surface and then do the waterproof construction. >>>More

1 answers2024-09-11

Generally, it is leveled first and then before, and there are several layers, such as leveling layer, waterproof layer, and insulation layer, which are generally leveled first.

6 answers2024-09-11

Toilet or squatting toilet?

Advantages and disadvantages of installing a toilet in the bathroom: >>>More

6 answers2024-09-11

It should be said that the waterproofing is done in the process of decoration, and it is usually done before the tile is pasted. >>>More

2 answers2024-09-11

Install the squatting toilet first and then fill it.