The waterproofing of the bathroom should be done before or after filling

Updated on Bathroom 2024-08-18
1 answers
  1. Anonymous users2024-01-24

    Generally, it is leveled first and then before, and there are several layers, such as leveling layer, waterproof layer, and insulation layer, which are generally leveled first.

Related questions
6 answers2024-08-18

It should be said that the waterproofing is done in the process of decoration, and it is usually done before the tile is pasted. >>>More

1 answers2024-08-18

Use bricks to make better, and then use Goljia waterproof paint, reinforced polyester cloth, etc. to do waterproofing.

2 answers2024-08-18

Do it before hanging the net, but as soon as the net is hung, the waterproof layer will be damaged, and it is best to repair it again after hanging the net.

2 answers2024-08-18

Yes, it will be better to be overhead and reduce the pressure on the floor.

3 answers2024-08-18

Before doing waterproofing for home decoration, it is recommended to determine the parts that need to be waterproofed, the specific area of waterproofing, and determine the suitable waterproof materials, and then ask the construction workers to come over for construction. >>>More