-
This mainly depends on the manufacturer. Basically, it's all batch by batch, and it's so efficient. 。My brother's field is like that, a month, a month
-
Depending on what kind of furniture, some take about a week or even longer.
This will be determined by factors such as the manufacturer's method and process! >>>More
Excluding the kind of complex workmanship and good craftsmanship, it generally takes more than ten days to produce and make; But to buy furniture, from the payment of the order, to the delivery of the home, it generally takes a month, and the kind that is in stock only takes a few days.
Hotel furniture proofing is generally about 15 days, and the mass production cycle is about 40 to 50 days after the sample is confirmed. >>>More
Different furniture styles have different requirements for the process of panels. Ordinary panel furniture has the shortest cycle, generally only about 15 days, while the paint board is about 30 days, if it is a blister board, it takes about 45 days, if it is solid wood, at least 60 days, 3 months is also possible. For example, the paint of the wardrobe door panel needs to be dried at enough time, if it is delivered to the customer's house too early, the paint surface will be dented when the hand is pressed, and on the other hand, the cabinet body also needs to be dried and released in the factory for a certain period of time. >>>More
The peak period of formaldehyde release is 3-5 months, and the volatilization is as long as more than ten years. >>>More