How long is the production cycle of custom furniture

Updated on furniture 2024-08-01
2 answers
  1. Anonymous users2024-01-24

    This will be determined by factors such as the manufacturer's method and process!

    Generally speaking, 18 days for modern plate type, 25 days for ordinary glass products, 30 days for special hardware, special process glass (such as painting, tempering, punching, etc.), thickened products, and 35 days for European-style products. This is almost the production cycle of general custom furniture manufacturers! Thank you for adopting, Xinyue German-style custom furniture sincerely answers for you!

  2. Anonymous users2024-01-23

    Generally, it is about 45 days.

    Cutting, thickness sanding, trimming, edge banding, hole rowing, surface finishing, trial assembly, cleaning, packaging, on-site installation.

Related questions
4 answers2024-08-01

Hotel furniture proofing is generally about 15 days, and the mass production cycle is about 40 to 50 days after the sample is confirmed. >>>More

1 answers2024-08-01

Excluding the kind of complex workmanship and good craftsmanship, it generally takes more than ten days to produce and make; But to buy furniture, from the payment of the order, to the delivery of the home, it generally takes a month, and the kind that is in stock only takes a few days.

3 answers2024-08-01

Hotel furniture proofing is generally about 15 days, and the mass production cycle is about 40 to 50 days after the sample is confirmed. >>>More

1 answers2024-08-01

First of all, you must clarify the shape and requirements you want with the manufacturer. From drawing to production, it can be as fast as two weeks, and as slow as maybe a month. The most important thing is the cooperation and service of the manufacturer, and there are many manufacturers on the Internet, and the good service is: Santo Furniture, Pengcheng, etc.

1 answers2024-08-01

The process of customizing furniture is divided into two parts, before and after the order is placed. The steps before placing an order are: measuring the ruler, making a design plan, determining the plan, and placing an order; Steps after placing an order: >>>More