Why is the custom furniture production cycle so long?

Updated on furniture 2024-08-23
3 answers
  1. Anonymous users2024-01-24

    Different furniture styles have different requirements for the process of panels. Ordinary panel furniture has the shortest cycle, generally only about 15 days, while the paint board is about 30 days, if it is a blister board, it takes about 45 days, if it is solid wood, at least 60 days, 3 months is also possible. For example, the paint of the wardrobe door panel needs to be dried at enough time, if it is delivered to the customer's house too early, the paint surface will be dented when the hand is pressed, and on the other hand, the cabinet body also needs to be dried and released in the factory for a certain period of time.

    80% of the country's custom furniture brands are in Guangdong, and from the perspective of logistics efficiency, Guangdong consumers should receive products faster than other places. A customer in Beijing placed an order and then produced in Guangdong, the production time may only be 20 days, but the transportation will take two weeks.

    Big brands have introduced imported production lines such as Halma from Germany, and introduced ERP management and flexible intelligent manufacturing systems to shorten unnecessary time as much as possible on the basis of ensuring quality. Using the intelligent system, the principle of flexible production line is to gather user orders together, and form the best plate production and utilization plan through computer calculation. Through a series of efforts, the problem of long cycle of custom furniture will also be improved.

  2. Anonymous users2024-01-23

    Different furniture materials are different, and the processing methods required are different, so the relative production cycle is a little longer.

  3. Anonymous users2024-01-22

    Because good furniture should be made of good materials.

    Slow work makes fine work.

Related questions
2 answers2024-08-23

You need to understand the customer's mental activity, and you have to get closer to him and her, which is much easier.

2 answers2024-08-23

This will be determined by factors such as the manufacturer's method and process! >>>More

4 answers2024-08-23

Hotel furniture proofing is generally about 15 days, and the mass production cycle is about 40 to 50 days after the sample is confirmed. >>>More

7 answers2024-08-23

Custom furniture is not expensive, our family is based on size, there is no custom fee.

1 answers2024-08-23

Custom furniture is not expensive, the finished product looks like custom furniture is expensive, but the finished furniture is an assembly line project, and the custom furniture is different, and the price will definitely be different if the quality is different.