Can the cast in place floor of the bathroom play a waterproof role?

Updated on Bathroom 2024-08-20
1 answers
  1. Anonymous users2024-01-24

    No, because the bathroom needs to be exposed to water for a long time in the future, it is recommended to use special waterproof materials to do waterproofing, so as to ensure a good waterproof effect.

    First of all, the bathroom is waterproof, the standard practice is that the ground needs to be done all, the wall should be at least meters high, it is recommended to do full height, if it is a light wall, then it must be done full height.

    Secondly, the bathroom is waterproof, it is recommended to choose the kitchen and bathroom waterproof slurry, first use the quick-setting repair mortar to repair and strengthen the yin and yang corners that are easy to leak, wear the pipe, and repair the periphery of the sanitary ware, and then use the permanent waterproof slurry to paint 2-3 times as a whole, and the thickness can be controlled in between.

    Finally, in addition to the height of waterproofing and the thickness of the brush, the proportion of waterproof coating, the time interval between brushing, and the selection of brushing tools also need special attention, so as to fully ensure the waterproof effect.

Related questions
1 answers2024-08-20

The bathroom guide wall is to pour the concrete guide wall at the same time when pouring the concrete slab surface of the bathroom (or kitchen), which is generally the same width as the wall and 200 high, which plays a waterproof role. The masonry of the bathroom (or kitchen) begins to be masonry on this concrete, and the purpose is to prevent the brick wall of the bathroom from absorbing water and the floor of the bathroom from leaking and seeping, which is a common practice.

3 answers2024-08-20

The main types of toilet waterproofing: cement-based waterproof coatings, polyurethane waterproof coatings; >>>More

1 answers2024-08-20

There are many kinds of waterproof materials, such as membranes for roofing and coatings for bathrooms.

1 answers2024-08-20

After the waterproof layer of the bathroom is completed, the closed water test is carried out for 72 hours, and the next step of construction is carried out after there is no leakage. >>>More

2 answers2024-08-20

If you want to get rid of cockroaches, you can buy some cockroach medicine or spray some radar on the ground.