Do you need to clean the water inside the bathroom after doing the waterproof test?

Updated on Bathroom 2024-08-20
2 answers
  1. Anonymous users2024-01-24

    1. Inspect and accept the appearance, variety, specification, packaging, size and quantity of materials, and form corresponding acceptance records.

    2. Check the quality certification documents of the materials and include them in the engineering and technical files.

    3. After the material enters the site, the material inspection report shall be issued according to the specification.

    4. When all the indicators of the physical properties of the material meet the standards, it is qualified; If an index does not meet the requirements of the standard, the index should be re-sampled in the tested product for re-inspection, and the re-test result meets the requirements of the standard, and the batch of materials will be judged to be qualified.

    5. Waterproof material. There are three main categories: waterproofing membranes; 911 polyurethane waterproofing material; New polymer cementitious waterproofing material.

    The last category is divided into general-purpose GS waterproofing materials and flexible JS waterproofing materials. Among them, the universal waterproof material is suitable for the waterproofing of the indoor floor and wall of the family.

  2. Anonymous users2024-01-23

    If the closed water test is performed according to the following method:

    1. After the waterproof construction is completed, you can do the closed water test after the waterproof layer is completely dry;

    2. Temporarily block the floor drain and the perimeter of the pipeline mouth;

    3. Build a 20CM high retaining wall at the door;

    4. Start to store water, with a depth of 5-20 cm, and mark the water level;

    5. The water storage time is 48-72 hours;

    6. After the water is closed on the first day, see if the water level has dropped significantly, if so, please check whether there is leakage around the roof and pipes downstairs in time, if not, continue to close the water;

    7. On the third day, the water is closed, and the downstairs ceiling and roof pipes are fully inspected.

    8. Carry out the next process after being fully qualified.

    Then the height of the water level should be between 5-20CM, after the water is closed, you can disassemble the blocked floor drain and the perimeter of the pipe, then most of the water will flow away, and the remaining small part can be removed with a shovel or open a window to ventilate and wait for natural drying.

Related questions
5 answers2024-08-20

The general regulations of the closed water orange experiment in the bathroom are 48-72 hours, and the final results may not be accurate, and the workers can also do other work at the same time when you do the closed water test, so the construction period and process will not be delayed.

1 answers2024-08-20

Do you mean watering or testing the water? Before doing waterproofing, it must be dry, watering waterproof can not be painted, waterproof must be done after the water must be tested to rest assured.

1 answers2024-08-20

I suggest that you still make sure that the waterproof layer is done well, so as to ensure that there will be no water leakage.