How to find the construction team to protect the rights of the bathroom leakage

Updated on Bathroom 2024-08-30
2 answers
  1. Anonymous users2024-01-24

    Bathroom leakage is the first thing to determine where the water leaks. Generally, there are three kinds of water leakage: 1. The waterproof layer leaks, which is manifested as serious water leakage downstairs after bathing or ground water, and the downstairs performance may be one or more places.

    The judgment method is very simple, plug the floor drain, and then release water on the ground, pay attention to the observation of the water leakage downstairs after 40 minutes, if the water leakage downstairs is serious, it is determined that the waterproof layer is leaking. In this case, you can find 100 million waterproofs on the Internet, and you can repair them by using 100 million waterproofing agents, caulking paste, and plastic steel mud. That is, the surface of the bathroom is waterproofed again, without planing tiles, saving time and cost.

    2. The sewer pipe is leaking, which is manifested around the sewer pipe, and there is a serious dripping phenomenon. The way to judge is to drain the floor, the hand basin, fill the water, and repeatedly flush the toilet, and see the aggravation of the water leakage downstairs, it is the leakage of the sewer pipe. In this case, find a repairer to replace the sewer pipe and try to reduce the bricks as much as possible.

    Then it also needs to be waterproofed under the ground rework, and there is no need to plane all the bricks. Yijia waterproof products can be used to waterproof the surface of the bathroom. 3. That is, the water inlet pipe leaks, if the water leakage is uniform and continuous, turn off the upper water, and the water will be reduced and will not leak.

    It means that the water pipe is broken. This situation can be solved by changing the open pipe, no need to planing bricks, or judging the leakage point by suppression, and changing the pipe!

  2. Anonymous users2024-01-23

    First of all, it should not be more than five years after construction, and there is no external damage to the waterproof layer after the construction is completed. You find the person in charge of him first, if it doesn't work, you can eliminate the association, it turns out that it is easier to have a contract when decorating.

Related questions
1 answers2024-08-30

Is it brushed before tiling? Does the waterproofing layer come off together? If the waterproof layer does not fall off, it is a problem with the craftsmanship of the tiling master.

3 answers2024-08-30

Generally, the wage is calculated according to the area of the tiles pasted, and the wage is different in different places.

4 answers2024-08-30

Only labor is a little more expensive, generally now the big work is 150 yuan to 200 yuan a day, the small work is 100 yuan to 150 yuan, a large and a small with the work of up to two days, if the material is fully prepared, it will be done in a day and a half. Because it is a wild construction right, there is no next meal after doing this meal, so the fee is relatively higher by 50% or more.

5 answers2024-08-30

The best way for the developer to paint glue and waterproof on the upstairs tiles is to plug the leakage, and the best way is to dig the bathroom upstairs and redo the waterproofing. This problem can be found by the property and the developer to urge the owners of the upstairs to re-do the waterproofing, and they have the responsibility and obligation to take care of this matter. Alternatively, you can ask your local property management association for help! >>>More

5 answers2024-08-30

If your house is not decorated, there is no relevant procedures for house inspection, you can find the property and the developer, communicate with the relevant issues, the property will give you reasonable treatment advice according to the actual situation, if the property is just simply done some remedies [tarpaulin] It is difficult to meet the normal waterproof needs, you should be based on reasonable waterproof standards, let the property be re-processed to achieve qualification, if there is no decoration, it should be within the warranty period. >>>More