The field construction team said that there should be 1,000 bathrooms and kitchens to be renovated,

Updated on Bathroom 2024-07-15
4 answers
  1. Anonymous users2024-01-24

    Only labor is a little more expensive, generally now the big work is 150 yuan to 200 yuan a day, the small work is 100 yuan to 150 yuan, a large and a small with the work of up to two days, if the material is fully prepared, it will be done in a day and a half. Because it is a wild construction right, there is no next meal after doing this meal, so the fee is relatively higher by 50% or more.

  2. Anonymous users2024-01-23

    Common sense is not calculated according to the room, but it is very likely that it is because of the small life so charged, I don't know where you are a friend, the standards in different places are not the same, if it is a wild decoration team, then I suggest that you only use him to pave the wall and floor tiles, according to the level, the rest of your buy who will give you free installation!

  3. Anonymous users2024-01-22

    It seems that you don't know much about the decoration market! A thousand bathrooms to steal fun.

  4. Anonymous users2024-01-21

    Wall tiles, floor tiles have professional bricklayers, sanitary ware, seller package installation, I don't know too much what you said about the wild construction team, no storefront, license, also called workers, not "wild" pay attention to your words,

Related questions
3 answers2024-07-15

Generally, the wage is calculated according to the area of the tiles pasted, and the wage is different in different places.

1 answers2024-07-15

Is it brushed before tiling? Does the waterproofing layer come off together? If the waterproof layer does not fall off, it is a problem with the craftsmanship of the tiling master.

5 answers2024-07-15

We all know that bathroom and kitchen decoration is a very important part of the construction, if the water and electricity renovation is not good, then the quality of life and the safety of people in the future can not be guaranteed 。The general people think that the waterway reconstruction is on the surface, just like the construction design of the waterway renovation of these problems, basically can not be fully understood, if there is a burst pipe after the transformation, or leakage, etc., do not know how to solve, the following points are the construction process of the waterway transformation, the specific problems to be solved. >>>More

1 answers2024-07-15

1. All partial decoration can directly find workers.

There are a lot of building materials near the general building materials market, and the decoration company generally has no one to pick up, and the amount of work is small. >>>More

4 answers2024-07-15

In fact, the kitchen is in addition to the bathroom, the second key waterproof place, the kitchen often washes, the water will often overflow, if you don't get it right, then seep into other rooms or neighbors' homes, repair will cost a lot, and troublesome, so you must do waterproofing, there are more waterproof products on the market, generally choose brand-name products, such as Sika, Degao.