My kitchen and bathroom are redecorated and need to be renovated by the team

Updated on Kitchen 2024-06-21
1 answers
  1. Anonymous users2024-01-24

    1. All partial decoration can directly find workers.

    There are a lot of building materials near the general building materials market, and the decoration company generally has no one to pick up, and the amount of work is small.

Related questions
2 answers2024-06-21

If you believe this, it is equivalent to rebuilding a kitchen, and you must worship the god of the stove!

3 answers2024-06-21

Confirm that the water supply and drainage do not need to be repaired and changed, waterproof and leakage, and the tile paste method can be used, which saves time and money, and the effect is good.

3 answers2024-06-21

Yes, some decoration companies can do partial decoration, but to talk about how to change water and electricity, this is a troublesome matter, add money is also here, talk about a few, do more comparison, and then there is waterproofing It is best to let the decoration company do it higher, it is necessary for the exterior wall.

3 answers2024-06-21

It needs to be redone, because in the process of reinstalling the bathroom, the worker master will not guarantee that it will not destroy the waterproof layer that was done before, if you are on the first floor, you don't have to do it again, if it is not the first floor, it is recommended to redo it, because once the water leaks and has to be renovated, the loss caused is not a little bit, and the current waterproof is not too expensive.

1 answers2024-06-21

Knock off the tiles, ask someone to pick up the garbage, load the car to throw more than 500, the tile spring with the shop + moving fee 1500 + mason salary 1000, waterproof material 300, >>>More