How to install the water tank squatting urinal, can you be more detailed, now the bathroom has a dra

Updated on Bathroom 2024-08-01
1 answers
  1. Anonymous users2024-01-24

    Check whether the ruler of the drain and squat pit drain is appropriate. Put the sealing ring to the drain outlet, if it is useless, you can replace it with putty, surround it in a circle, and then put fine sand around it, put the squatting pit on it, level it with a level, and the center of the water tank and the center of the squat pit should form a line, connect the squatting pit, and finally cement leveling.

Related questions
3 answers2024-08-01

The flush valve is not very good and cannot turn off the flow of water when the water pressure is insufficient.

1 answers2024-08-01

It should be that the pressurized water inside is broken, and you can find a master to replace it.

3 answers2024-08-01

1. According to the sewage outlet of the installed product, reserve the sewer pipe at the appropriate position from the wall, and determine the distance between the inlet of the sewer pipe and the ground level, and pay attention to match the pit distance of the squatting toilet. Pit distance refers to the distance between the center of the toilet sewer pipe and the wall, generally 300mm, 350mm, 400mm, 450mm, etc. Choosing the right squat toilet is the first thing to choose is to choose the right pit distance. >>>More

2 answers2024-08-01

If you <> split, you should first install the drain valve and then fix the water tank. Image taken from Limb Pictures. For the examination of the ginseng cong. Infiltrate Qi Annihilation.