Friends, please help the whole process of waterproofing the bathroom, thank you for telling

Updated on Bathroom 2024-08-20
2 answers
  1. Anonymous users2024-01-24

    Nowadays, the toilet basically has a caisson, so the standard process is: waterproofing in the backfill pit - doing a closed water test - backfilling leveling - waterproofing the ground and wall - doing a closed water test - completion.

    As for the material, it is recommended to use kitchen and bathroom waterproof slurry, and the following is the detailed construction method:

    1.Clean the base surface and sprinkle it with water to moisten but there should be no stagnant water.

    2.Prepare the quick-setting repair mortar, add water to the quick-setting repair mortar according to the ratio of 3:1, and the adjusted mortar needs to be used up within 5 minutes. The quick-setting repair mortar is evenly brushed on the yin and yang corners, pipes, sanitary ware, floor drain periphery and other parts that are prone to water seepage.

    3.Pour the waterproof liquid and powder into the bucket, then stir evenly with an electric rod, let stand for 3 minutes and stir again for later use.

    4.Paint waterproof coating, the bathroom floor needs to be done, the wall needs to be painted at least to the meter, it is recommended to do the full height. Brush 2-3 times, the total thickness is in.

    5.After the waterproof coating is dry, it is recommended to make a protective layer of mortar in order to ensure strength.

    After the hour, sprinkle water for maintenance, and the part exposed to direct sunlight needs to be covered.

  2. Anonymous users2024-01-23

    Clean the foundation and brush it with waterproof paint. The walls should also be brushed, painted two or three times. After drying, plug the threshold and drain at least 10 centimeters of water. After two days, observe whether there is any water seepage.

Related questions
2 answers2024-08-20

The bathroom is waterproof, the standard requirement is that the ground needs to be done, the wall should be at least meter, it is recommended to do the full height, if it is a lightweight wall, then it must be done full height. >>>More

2 answers2024-08-20

It's best to find someone who knows how to do it, the effect of doing it yourself is not very good, and there are some details that can be well grasped by experience. >>>More

1 answers2024-08-20

It has been more than half a year since the water leakage incident, and even if the tiles want to be puffed up, they have already been puffed up. >>>More

4 answers2024-08-20

1. Inspect and accept the appearance, variety, specification, packaging, size and quantity of materials, and form corresponding acceptance records. >>>More

1 answers2024-08-20

Is 1 all liquid material together? If it is, it doesn't work, and if it's not together, it doesn't matter. Do a closed water test.