The engineer said that the whole process of waterproofing the bathroom is good

Updated on Bathroom 2024-07-12
2 answers
  1. Anonymous users2024-01-24

    The bathroom is waterproof, the standard requirement is that the ground needs to be done, the wall should be at least meter, it is recommended to do the full height, if it is a lightweight wall, then it must be done full height.

    As for the material, it is recommended to use kitchen and bathroom waterproof slurry, first use quick-setting repair mortar to repair and strengthen, and then use permanent waterproof slurry to do waterproofing as a whole, so that the waterproof effect is guaranteed.

    Here's how to do it:

    1. Chisel the cracks and parts that need to be repaired such as the root of the pipe and the floor drain into a "V" shape, clean them, and sprinkle them with water to moisten them;

    2. Add water (water-cement weight ratio 1:2 3) to the [permeable crystalline repair mortar] and mix it evenly, and carry out repair construction before the initial setting (within 5 minutes), and the root of the pipe, the perimeter of the floor drain, the yin and yang corners, and the root of the wall should be made into r angles;

    3. After the final setting of the repair mortar, stir the powder and liquid material of [durable waterproof slurry] evenly, let it stand for 3 minutes, stir it again and evenly brush it on the base surface, and it should be cross-brushed twice, and only after the first surface is dry can the second construction be carried out;

    4. Anti-stampede after completion, closed water inspection can be carried out after 48 hours.

  2. Anonymous users2024-01-23

    New home?

    Waterproofing is not recommended for coatings, or membranes are better. It is recommended that the waterproof height should be treated with special treatment for pipes and floor drains, and you can use plugging spirit or sealant.

    After completion, do a 24-hour water storage test, remember to clear the downstairs neighbors to see the follow-up tiles and be careful not to destroy.

    Remember to find a slope when paving tiles, and do not store water.

Related questions
1 answers2024-07-12

1. The cost of all specific bathroom waterproofing depends on the waterproof scheme you choose and the waterproof material you choose. >>>More

1 answers2024-07-12

The bathroom must be waterproofed on the wall, and the wall should be waterproofed before the wall tiles are laid. In the general waterproof treatment, the wall should be waterproofed with a height of 30 cm, but for non-load-bearing light walls, the whole wall should be waterproofed, at least 60 cm high. >>>More

3 answers2024-07-12

Try not to damage the original waterproof layer.

In the newly delivered building, the floors of toilets, bathrooms and kitchens are all waterproofed in accordance with the relevant specifications, and as long as the original waterproof layer is not damaged, there will generally be no leakage. But now the common problem is: the decoration will add some bathing facilities and a variety of water and water pipelines to rearrange or move, itself has destroyed the original waterproof layer, and did not repair or redo the waterproof construction in time, so it is very easy to leakage. >>>More

2 answers2024-07-12

It's best to find someone who knows how to do it, the effect of doing it yourself is not very good, and there are some details that can be well grasped by experience. >>>More

1 answers2024-07-12

Bathroom, kitchen, balcony: belong to the waterproof part of the waterfront surface. Choose rigid or cement-based waterproofing materials for toilet waterproofing practices: >>>More