    With the improvement of living standards, more and more people will choose the ceiling when decorating the balcony, which looks more beautiful, but many people do not know much about the installation sequence of the balcony ceiling and drying rack, so the ceiling or the drying rack first? What is the installation process of the drying rack? With these two questions in mind, let's take a look!

    It is usually recommended to install the drying rack first and then the ceiling, so that some accessories such as the installation of the drying rack can be well hidden in the ceiling and look beautiful and generous. On the other hand, if the ceiling is suspended first and then the drying rack is installed, the ceiling will not only have to be perforated, but also look more rough when it is routed.

    What is the installation process of the drying rack?

    1. Installation of the hand shaker.

    First of all, install the hand shaker, it is recommended to install it in the most convenient place for the hand, generally on the right hand side of the balcony, about 120 cm from the ground with expansion screws, the specific height can be determined according to the user's height and usage habits.

    2. Installation of the top seat.

    Secondly, install the top seat on the top of the balcony, measure the diameter of the lights, mark them respectively, and then determine the width of the top seat. Finally, use electric drilling, and fix the top seat with expansion screws.

    3. Install the corner.

    Then install the corner on the top of the wall and the top limb mold of the balcony, 50-70 cm away from the movable roof, and maintain a vertical line with the installation position of the rocker. At the same time, connect the 2 steel wires of the drying rack, pay attention to the steel wire to be vertical to the ground, and then put it into the top cover, and clamp the top seat cover.

    4. Drying rod connection.

    Finally, you can connect the drying rod of the drying rack, pass the drying rod through the hanging ball, and then fix the hanging ball with screws, and install plugs at both ends of the drying rod.

    Summary: The above is to introduce you to the ceiling or the first installation of the drying rack and the installation process of the drying rack is the relevant content, I hope to help friends in need, if you need to know more about the relevant knowledge in the later stage, welcome to pay attention to Qeeka Home.

  2. Anonymous users2024-01-23

    Generally, the ceiling is suspended first, and the lifting drying rack is to install the ceiling first, and if it is a single-tube drying rod, it can be reserved before the ceiling.

Related questions
1 answers2024-06-10

In the decoration, the balcony must be suspended first, and the wall treatment must be completed before the drying rack can be installed, that is, after the decoration is completed, the drying rack can be installed later.

4 answers2024-06-10

Many people will use the balcony at home to dry clothes, so we may also encounter such a problem when we are initially decorating: should the balcony be installed with a drying rack or a ceiling first? If you don't know anything about this, let's take a closer look. >>>More

3 answers2024-06-10

Install the integrated ceiling first, install the ceiling and the bath bomb at one time, and the people on the balcony are not equipped with the lamp of the integrated ceiling. If you want to add additional lights, you have to pay attention to the location, so as not to affect the position of the drying rack at that time. Workers often do this, so it's best to ask the workers or the merchant you buy from.

3 answers2024-06-10

If you install a suspended ceiling, don't install a lifting drying rack, and it will always be ugly if you have a few holes.

1 answers2024-06-10

Affected by the construction of some decoration workers, some people may feel that it is not to install the ceiling first and then install the lifting clothes pole, in fact, the correct step should be to install the clothes pole first and then carry out the ceiling, why do this? >>>More