Whether the balcony is suspended first or installed with a drying rack first

Updated on Balcony 2024-03-18
1 answers
  1. Anonymous users2024-01-23

    In the decoration, the balcony must be suspended first, and the wall treatment must be completed before the drying rack can be installed, that is, after the decoration is completed, the drying rack can be installed later.

Related questions
3 answers2024-03-18

Install the integrated ceiling first, install the ceiling and the bath bomb at one time, and the people on the balcony are not equipped with the lamp of the integrated ceiling. If you want to add additional lights, you have to pay attention to the location, so as not to affect the position of the drying rack at that time. Workers often do this, so it's best to ask the workers or the merchant you buy from.

3 answers2024-03-18

If you install a suspended ceiling, don't install a lifting drying rack, and it will always be ugly if you have a few holes.

9 answers2024-03-18

Install the drying rack first and then hang the ceiling, so that it is firmer. In some cases, the drying rack is installed after the ceiling, and the fixing point of the drying rack is left first. >>>More

5 answers2024-03-18

Install the clothes pole first, and then carry out the balcony ceiling. >>>More

9 answers2024-03-18

1.The normal is to install the ceiling first, after the ceiling is installed, determine the height of the entire cabinet, our wall cabinet can not lean on the top of the wall cabinet, to avoid sanitary dead ends. >>>More