How to make water leakage in the bathroom sewer pipe easy and easy to use?

Updated on Bathroom 2024-06-30
4 answers
  1. Anonymous users2024-01-24

    There is a method of filling the seepage, and the glue that has expanded in case of water can be filled by injecting the water at high pressure into the seepage place, which can be used for several years. It is necessary to find a professional leak filling team to carry out this kind of construction, and the fee is relatively high.

  2. Anonymous users2024-01-23

    If it is a leak in the drainage pipe (sewage pipe), it is impossible to make a small fuss. If it is a water supply pipe, you can choose to scrap the rotten pipe below and re-take an open pipe PVC, without turning the ground, and replace it with a new pipe, and the cost is low.

  3. Anonymous users2024-01-22

    Leaking water from the toilet sewer pipe seeps out from there.

    The original sewer pipe was cast iron. Or PVC.

    There, ooze there. Use the king of leaks. 10 yuan a bag.

    Note; Be sure to use it while mixing. It's hard in a few minutes.

  4. Anonymous users2024-01-21

    You smash the floor tiles along the sewer pipe of the washbasin and the drain of the floor drain, absorb the water below with a towel, and until you can't see the open water, buy a bag of water that does not leak and paste it into a paste and coat it with a thickness of about 1CM, and don't see water for 24 hours.

Related questions
2 answers2024-06-30

The noise pollution generated by water pipes is generally the resonance caused by the noise caused by the water running in the pipeline and the impact and friction between the water and the pipeline. It can be dealt with by addressing resonances and airborne sounds. Specifically, it can be wrapped in vibration damping and sound insulation materials, and the effect is very good. >>>More

2 answers2024-06-30

1. Make a guarantee with soundproof cotton: measure the size of the sewer pipe and cut the soundproof cotton into sections. Wrap a section of soundproof cotton onto the main sewer pipe (i.e., the thick sewer pipe vertically). >>>More

13 answers2024-06-30

The surface of the solid wall is directly treated with waterproof glue. >>>More

2 answers2024-06-30

During construction, the entire sewer pipe of the toilet should be closed first, and only local treatment should be done; >>>More

7 answers2024-06-30

The toilet sewer pipe should be lower than the ground, which is conducive to drainage and does not need to be waterproofed.