If the wall of the bathroom in the well decorated room is leaking, can I claim compensation from the

Updated on Bathroom 2024-06-15
1 answers
  1. Anonymous users2024-01-24

    Sure, take pictures to keep the evidence, as long as the losses are reasonable, the general developer will take the initiative to compensate.

Related questions
1 answers2024-06-15

It depends on how many years of warranty you have signed the contract with the decoration company, and the general company has a warranty of 1-2 years. You look for the contract, the warranty period is not the responsibility of the developer, do not deal with the local quality supervision department to complain, they are in charge of this matter, and then do not go to court to sue, otherwise the warranty period is self-care.

5 answers2024-06-15

What should I do if the floor of the master bedroom is blackened due to leakage in the bathroom of the finely decorated room? If this is the developer's problem, you can find the developer, if you are looking for decoration, who do you look for for whose problem?

3 answers2024-06-15

It's a difficult thing to do. The bathroom can open the window, which will be considered when designing the drawings. The addition of a row of windows may affect the aesthetics and solidity of the building's façade. Most developers won't agree.

2 answers2024-06-15

The renovation of water and electricity in the bathroom renovation is particularly important and needs to be started as early as possible, because it will involve the heating of the bath bomb, the line direction of the light, the wall of the water pipe, etc., so it is necessary to develop a detailed water and electricity design before the transformation, so as to improve the safety quality and meet the needs of the decoration owners. It is best for the owners to make it more convenient to repair and maintain in the future when the bathroom is renovated with water and electricity, and then do a good job of concealing it.

1 answers2024-06-15

It is necessary to check whether there is a clear provision in the check-out conditions of the purchase contract, if there is no clear provision, the only way to do so is to ask the developer to carry out repairs, and at the same time, you can recover from the developer for the delay in delivery and other related losses.