How to make the bathroom floor of the open pipe waterproof

Updated on Bathroom 2024-06-15
2 answers
  1. Anonymous users2024-01-24

    You didn't describe the situation very clearly, so I'll talk about both cases!

    If your open pipe was wrapped with ordinary mortar before, then it is recommended to do waterproofing requires rigid-flex construction, first painted with waterproof coating, and then used mortar waterproofing agent to make a protective layer, so as to achieve the best waterproof effect.

    If your open pipe is not specially wrapped before, then you can directly use Lloyer mortar waterproofing agent to wrap the open pipe first, and the rest of the rest can also be made with mortar waterproofing agent.

  2. Anonymous users2024-01-23

    The waterproofing of the bathroom floor of the open pipe can be made of flexible materials, such as polyurethane, the thickness is not less than 2mm, and the closed water test is necessary for 72 hours after the waterproof layer.

Related questions
2 answers2024-06-15

1.The removal of the wall and the ground is very important, and it directly affects whether the waterproofing of the bathroom can be done at one time. >>>More

4 answers2024-06-15

Because there is a lot of water in the bathroom, in order to let the water flow into the floor drain as soon as possible, the ground must do a certain slope, and there are no specific regulations on the size of the slope. Some owners need a steeper slope, in order to make the water flow faster, even if the water is not smooth, when bathing, the water will not flow outside. >>>More

9 answers2024-06-15

How do you make a bathroom waterproof? Let's find out.

Bathroom waterproofing needs to be painted with waterproof paint twice, the first waterproof coating needs to ensure that it is firmly combined with the base layer, and then brush the second time after the first paint is dry, and then carry out a closed water experiment after completing the brushing, and observe that there is no leakage before it is completed. >>>More

1 answers2024-06-15

To do a good job of ground waterproofing: before laying floor tiles, we must do a good job of waterproofing engineering; After the tile is laid, it is necessary to ensure that the brick surface has a drainage slope (generally about 1% is appropriate), and the slope is towards the floor drain, which is conducive to wastewater discharge. >>>More

2 answers2024-06-15

Do a good job of waterproofing layer and choose flexible waterproof materials. After doing so, do a 48-hour closed water test and conduct an inspection. >>>More