It has only been 3 months since the delivery of the house, and the house has been renovated before t

Updated on Kitchen 2024-06-15
1 answers
  1. Anonymous users2024-01-24

    If the renovation is done by the developer, the developer is responsible.

    If you renovate the house yourself, you are responsible for it.

Related questions
5 answers2024-06-15

After the house is renovated, it is necessary to ventilate more, disperse odors, and it is best to detect the formaldehyde content.

21 answers2024-06-15

The smell of the paint itself has not been removed, it will cause harm to you and your child's body, and it is recommended not to live.

1 answers2024-06-15

If it is against the water pipe interface, nine times out of ten the water pipe interface is leaking, shovel off some of the bulging latex paint and take a look.

2 answers2024-06-15

Usually pay attention to cleaning and moisture.

3 answers2024-06-15

Close the doors and windows to measure the indoor formaldehyde does not exceed the standard, but the furniture drawer exceeds the standard by more than 3 times, which requires the furniture to remove formaldehyde, and there is no need to change the furniture for the time being. Excessive formaldehyde in furniture is generally caused by the poor quality of the board and more adhesives, and it is recommended to use activated carbon, alcoidine and other substances to remove formaldehyde and deodorization. >>>More