Can the well decorated bathroom be adjusted locally?

Updated on Bathroom 2024-05-10
2 answers
  1. Anonymous users2024-01-23

    The renovation of water and electricity in the bathroom renovation is particularly important and needs to be started as early as possible, because it will involve the heating of the bath bomb, the line direction of the light, the wall of the water pipe, etc., so it is necessary to develop a detailed water and electricity design before the transformation, so as to improve the safety quality and meet the needs of the decoration owners. It is best for the owners to make it more convenient to repair and maintain in the future when the bathroom is renovated with water and electricity, and then do a good job of concealing it.

  2. Anonymous users2024-01-22

    The closed water test needs to be closed for two days after the waterproof layer is completed. After checking that there is no penetration, the water is released, and the cement sand is made on top again as a protective layer to prevent the waterproof layer from being damaged when tiling.

Related questions
1 answers2024-05-10

It is necessary to check whether there is a clear provision in the check-out conditions of the purchase contract, if there is no clear provision, the only way to do so is to ask the developer to carry out repairs, and at the same time, you can recover from the developer for the delay in delivery and other related losses.

2 answers2024-05-10

I'm engaged in decoration, the shower is waterproof meters high, the other 200 high, no matter how high the waterproof is, the water pipe, the sewer pipe is not professional is a headache.

9 answers2024-05-10

Water seepage in a house can be divided into three scenarios: >>>More

1 answers2024-05-10

It depends on how many years of warranty you have signed the contract with the decoration company, and the general company has a warranty of 1-2 years. You look for the contract, the warranty period is not the responsibility of the developer, do not deal with the local quality supervision department to complain, they are in charge of this matter, and then do not go to court to sue, otherwise the warranty period is self-care.

1 answers2024-05-10

The ceiling can be suspended, and if there is a demand, the ceiling can be added on the basis of the current gypsum line.