What needs to be done before tiling the bathroom

Updated on Bathroom 2024-06-23
1 answers
  1. Anonymous users2024-01-24

    1 All 1Waterproof and moisture-proof materials: there is often a lot of water and fog in the bathroom, and the tiles should have a good waterproof and moisture-proof function, that is, the water absorption rate should be low.

    2.Closed water test before tiling: Before laying tiles in the bathroom, the ground and wall must be waterproofed, and the closed water test must be carried out (generally need to be done twice), and then paved after ensuring that there is no leakage, otherwise, after paving, the leakage phenomenon can only be scraped off and re-paved.

    3.Tile after changing the water circuit: Under normal circumstances, the renovation involves changing the water circuit, and the floor tiles and wall tiles must be laid after the change work is completed and confirmed.

    4.The rougher the wall, the stronger the sticky: It is best to rough the wall before tiling, so as to increase the contact area between the cement and the wall.

    Usually you can use an electric drill to drill some pits on the wall, or roll the glue on the wall first, and then throw the cement water onto the wall, after the cement solidifies, it will be potholes, and then you can paste the tiles.

    5.Make full use of tools: when tiling, the bricklayer must be required to pull the line, and supplemented by a level, no matter how good the bricklayer's craftsmanship is, how good it feels, he must be resolutely required to use tools to control the quality.

    6.Timely use of glue: When pasting the wall of the bathroom pipe, in order to increase the adhesion, L 08 glue should be added to the normal cement mortar.

    7.Prevent hollow drumming: after two or three hours of tile pasting, you can tap the four corners of the tile, and you have to knock it piece by piece, and you must rework when you hear the sound of empty drum, otherwise it is easy to cause the tile to crack when you punch holes in the tile due to the installation of things in the future.

    8.Do not change the pipeline: The pipes in the bathroom should be avoided as much as possible, otherwise it is easy to destroy the waterproof layer and cause leakage.

    9.Increase the slope of the ground: The floor of the toilet must be sloped to the floor drain, so that the water on the ground can be drained from the floor drain.

Related questions
2 answers2024-06-23

There are a lot of things that are needed.

1. Design in advance: water heater, washing machine, mop pool, handwashing station, water heater and other water pipes are laid, and the sewer pipe position is reserved. >>>More

1 answers2024-06-23

Toilet waterproofing practices:

1. Ground treatment. >>>More

7 answers2024-06-23

In fact, about the bathroom wall tiling to do the beauty of the seam still depends on your personal importance to the aesthetics, the beauty of the seam it is for the sake of aesthetics and the role of the caulk is probably the same, according to the color of your home tile to decide. But no matter whether you do beauty sewing or not, because the bathroom is still exposed to more moisture, Tian Feng and the seal must be done for sure.

4 answers2024-06-23

We will definitely encounter the bathroom tile project in the decoration process, which often makes us anxious and at a loss, so what are the precautions for bathroom tiling? Is there any way to apply tiles in the bathroom, as well as tips and tricks? Let's take a look at the process of tiling the bathroom. >>>More

1 answers2024-06-23

Before decoration, carefully check whether there is leakage in the kitchen and bathroom on the upper floor, and if there is, you should first do the waterproof project upstairs before decorating. If there are no occupants on the upper floor for the time being or for other reasons, the waterproofing works on the upper floor cannot be treated for a while, measures should be taken to remedy the situation: apply polyurethane to the bottom of the leaking part, but the plastering layer of the leaking part should be disposed of and the base layer should be dried.