-
The maintenance time of Nippon Paint waterproof slurry is 48 hours, and two days is OK.
-
Nippon Paint waterproof materials, Guoerjia waterproof materials and so on such big brands of waterproof materials are generally 48 hours after the completion of the construction of closed water test
That is true.
Because after the installation. >>>More
After doing waterproofing, the time of the closed water test is 48-72 hours, and you can do the closed water test after the waterproof layer is completely dry, generally about 24 hours can be completely dry (2 days ago, it is recommended to do the waterproof for about two days in 48 hours (the time is not standardized, the standard is to see if the waterproof is dry), 24 hours after the closed water test, go downstairs to see if there is a water leak. >>>More
Kitchen and bathroom waterproofing, it is best to do two - take a little effort, once and for all!
The waterproofing of the roof is made of asphalt and membrane waterproofing. In the past, indoor waterproofing was also done in the past, but now it has been changed to waterproof coating, asphalt waterproofing has a taste, and it is not easy to apply tiles. It is best to use paint for waterproofing.
Of course you can, but you don't do it as well on your back as you do on the back water. As long as the surface of the water is done, there will be no leakage.