The bathroom is waterproofed and can be watered for a few days

Updated on Bathroom 2024-05-27
1 answers
  1. Anonymous users2024-01-24

    Guoerjia Waterproof Engineering Co., Ltd. tells you: Generally, the effect is tested 48 hours after the water test.

Related questions
1 answers2024-05-27

Of course, it is possible to wait until the bathroom waterproof is completely dry, it is recommended to do a closed water test to check whether there is any negligence in the waterproof construction, whether the waterproof function is sound, and wait until the closed water test is passed, and then place it and wait for the knot. >>>More

1 answers2024-05-27

Under normal circumstances, the construction unit will leave enough thickness for the leveling layer when pouring the floor floor. For example, the thickness of 3cm and 5cm should be leveled with cement mortar, but the previous floor must be a rough floor, so as to ensure that the upper and lower layers are firmly bonded. >>>More

2 answers2024-05-27

The floor tiles are delaminated, mainly because of the lack of printing water when laying the bricks. >>>More

2 answers2024-05-27

As long as the wall. Plastering.

With cement mortar, there will be no water leakage. To the wall there will be an upward watermark, is due to do. >>>More

2 answers2024-05-27

It is not possible to directly tile.

1: To wait for 24 hours to test the water, the water test time is at least 24 hours, the test height is best to put the water flush with the door as well. >>>More