In home renovation, when is it better to do bathroom waterproofing?

Updated on Bathroom 2024-03-25
2 answers
  1. Anonymous users2024-01-23

    After the bathroom is changed to water and electricity and floor drain, it should be waterproof, not only the ground, but also the wall from the ground around it should be 200mm high, and the wall in the shower should be 1500mm high, and the floor tiles can be paved after waterproofing.

  2. Anonymous users2024-01-22

    In the decoration, it is generally the bathroom waterproofing that begins after the bathroom decoration is completed.

    Bathroom waterproofing tips:

    1.Interior decoration must be done wall waterproofing, before laying wall tiles, do a good job of wall waterproofing. The general treatment method is to make the wall waterproof to 30 cm high, but at present, the bathroom of Chinese residential houses generally uses a shower room, which requires the entire wall to be meters high.

    If it is a lightweight wall, it is better to paint it in its entirety, from the bottom to the top. This kind of waterproofing is comprehensive, so that the waterproofing can be done in place at one time.

    2.Indoor waterproofing, the joints between the wall and the ground and the joints of the pipes between the water and the water are the most likely places to cause problems, we must urge the workers to deal with such corners and corners, the waterproof paint must be applied in place, if it is not in place, then the waterproof layer will be done in vain, so each joint point must be in place, and it is best to be drip-proof. Each work point must supervise the construction master to do fine work.

    3.If the original floor tiles in the bathroom are replaced, after the original floor tiles are chiseled, the ground must be leveled with cement mortar, and then waterproof treatment must be done, so that the waterproof coating can be avoided due to uneven thickness and leakage, and also avoid affecting the service life of the material because of the uneven base layer, and the waterproof material plays the greatest role.

    4.Indoor decoration, try not to destroy the original waterproof layer, in the new delivery of the building is generally made of waterproof layer, so try not to destroy the original waterproof layer. Be careful at every construction site, because some waterproofing materials are relatively thin, and a little carelessness may damage the waterproofing layer.

Related questions
6 answers2024-03-25

Bathroom

Waterproof practices >>>More

4 answers2024-03-25

Decoration must not only care about the shape, the good-looking skin is very simple, and the quality of construction is the last word, such as the waterproofing of the bathroom, the top priority. >>>More

11 answers2024-03-25

After the wall is renovated, the water and electricity have also been changed, and the waterproofing of the kitchen and sanitation must be done before starting to tile.

2 answers2024-03-25

The temperature must not be below 0.

6 answers2024-03-25

Before tiling, the purpose of waterproofing was to be afraid of water leakage downstairs, dampness and peeling on the back of the side wall, and other phenomena Generally do a high position of one person on the line, and do a 24-hour experiment of closed water.