When is bathroom waterproofing done?

Updated on Bathroom 2024-01-27
11 answers
  1. Anonymous users2024-01-23

    After the wall is renovated, the water and electricity have also been changed, and the waterproofing of the kitchen and sanitation must be done before starting to tile.

  2. Anonymous users2024-01-22

    ters in the north

  3. Anonymous users2024-01-21

    Decoration must not only care about the shape, the good-looking skin is very simple, and the quality of construction is the last word, such as the waterproofing of the bathroom, the top priority.

    If you don't want the downstairs neighbor to knock on your door after moving in, hurry up and take a look at how to do this bathroom waterproofing.

    Ground treatment: 1. Brush the waterproof paint for the first time. Before construction, ensure that the construction site is clean and dry, and the waterproof coating should be coated with no omission, firmly combined with the base layer, no cracks, no bubbles, and no falling off. The coating height is consistent, and the thickness should meet the requirements of the product.

    PS: Floor drains, wall corners, pipe heels and other joints should be painted with high elasticity and flexible waterproofing, because the joints between the wall and the floor of the bathroom will be displaced and are most likely to seep water.

    2. Brush the waterproof paint for the second time. Note that there needs to be a certain time interval between the second waterproof coatings, and the second pass can only be carried out after the paint is dry, and the specific time depends on the coating. If the interval is too short, the waterproof effect will be greatly reduced.

    3. Lay a protective layer. In order to prevent the subsequent construction from damaging the waterproof layer, it is necessary to lay a protective layer on the surface of the waterproof coating. The protective layer should be completely covered with the waterproof layer, no omission, firmly combined with the base layer, no cracks, no bubbles, and no falling off.

    4. Closed water test. During the closed water test, the waterline at the ground point should not be less than 2 cm, and it should be stored for at least 24 hours, and it should be qualified only after observing that there is no leakage. If there is a leak, it needs to be redone, and you must not be negligent.

    PS: How to do the closed water test.

    1.Plug the floor drain.

    2.Make a water barrier at the door of the bathroom.

    3.Avoid direct contact with the ground when releasing water, and remember to cushion.

    4.The waterline should not be lower than 2 cm, and it should be marked.

    5.Keep it for at least 24 hours and go downstairs to see if there is any leakage (say hello to your neighbors in advance).

    6.Don't be too troublesome.

    Wall Treatment: 1If the bathroom has a shower room, the waterproof should be 180cm, and if there is a bathtub, the waterproof height of the wall adjacent to the bathtub should be 30cm higher than the bathtub

    2. After the waterproof layer is done, a certain amount of time should be left to make the waterproof layer better integrated with the building, and then the protective layer on the waterproof layer and then paved with floor tiles.

    4. Waterproofing is a systematic project, and the causes and treatment methods are different in each place. Materials are the foundation, construction is the key, and follow-up service is the guarantee.

  4. Anonymous users2024-01-20

    After the bathroom decoration is completed, the bathroom waterproofing will be started.

    Indoor bathroom waterproofing tips:

    1. The interior decoration must be waterproof, and the wall waterproofing should be done before laying the wall tiles. The general treatment method is to make the wall waterproof to 30 cm high, but at present, the bathroom of Chinese residential houses is generally used as a shower room, which requires the entire wall to be made meters high. If it is a lightweight wall, it is better to paint it in its entirety, from the bottom to the top.

    This kind of waterproofing is comprehensive, and it can be waterproof at one time.

    2. Indoor waterproofing, the joints between the wall and the ground and the joints of the pipes between the water and the water are the most prone to problems, we must urge the workers to deal with these edges and corners, and the waterproof coating must be applied in place. Each work point must supervise the construction master to do fine work.

    3. Interior decoration. If you need to replace the original floor tiles in the bathroom, after chiseling the original floor tiles, you must first level the ground with cement mortar, and then do waterproof treatment, so as to avoid leakage caused by the uneven thickness of the waterproof coating, and also avoid affecting the service life of the material because of the uneven base layer, and the waterproof material plays the greatest role.

    4. Interior decoration, try not to destroy the original waterproof layer. In the newly delivered buildings, the ground is generally made of waterproofing, so try not to damage the original waterproofing layer. Be careful at each construction site, because some waterproofing materials are relatively thin, and a little carelessness may damage the waterproofing layer.

    5. For interior decoration, the decoration team is required to do a good job of cement mulch for the upper and lower water pipes of the bathroom, brush 10 to 20 cm of waterproof paint from the ground, and then redo the waterproof on the ground, plus the original waterproof layer, to form a composite waterproof layer to enhance waterproofness.

    6. Interior decoration, the water pipe groove in the wall should also be waterproof, and the waterproof layer around the hole must be carefully constructed when the pipe, floor drain and so on pass through the floor slab during the construction process. Buried water pipes in the wall, so as to achieve a reasonable layout, lay water pipes are made of grooves larger than the pipe diameter, plastering in the groove is smooth, and then brush waterproof paint in the groove.

    7. With 24 hours of "water storage test" acceptance waterproofing, after the waterproof project is completed, seal the door and sewer, fill the bathroom ground with water to reach a certain liquid level height, and make a mark, if the liquid level does not drop significantly within 24 hours, especially the roof of the downstairs house does not leak, the waterproof is qualified.

  5. Anonymous users2024-01-19

    Bathroom waterproofing is done after the installation of water and electricity, before the tiles and floors are laid. Before waterproofing, cement mortar can be used to seal all the parts of the water pipe through the wall, but because the cement mortar shrinks greatly and the viscosity of the pipeline material is poor, in order to avoid leakage of water at the pipe part of the wall in the future, it is best to use the plugging king or nozzle grouting material to block all the parts of the water pipe through the wall. Wait until the blocked material is completely dry (about 24 hours later) and apply waterproofing.

    Leibangshi - home waterproofing expert.

  6. Anonymous users2024-01-18

    Before you put the tiles, you have to find someone to do the waterproofing. Bathroom waterproofing is done after the installation of water and electricity, before the tiles and floors are laid. Before waterproofing, cement mortar can be used to seal all the parts of the water pipe through the wall, but because the cement mortar shrinks greatly and the viscosity of the pipeline material is poor, in order to avoid leakage of water at the pipe part of the wall in the future, it is best to use the plugging king or nozzle grouting material to block all the parts of the water pipe through the wall.

    The plugged material is completely dry and solid.

  7. Anonymous users2024-01-17

    You can start by smoothing that trough with cement. Do waterproofing before laying floor tiles.

  8. Anonymous users2024-01-16

    According to common sense, it is best to make the waterproof layer at the lowest level, install all kinds of pipes on the waterproof layer, and then seal it with cement slurry, and then do the waterproofing again, of course, it is the best, so that even if the water pipe leaks, it will not leak downstairs, otherwise it will quarrel and fight.

  9. Anonymous users2024-01-15

    Yes After the wall is flattened, before tiling.

  10. Anonymous users2024-01-14

    That's right, it's better to do it after you do it, and it won't dry if you do waterproofing, and the water pipes on the wall of "Upstairs" don't seem to have anything to do with waterproofing, right? Do you have to pick them up when you do waterproofing? ? It's no problem to change the water after doing it The plumber will leave a gap for the waterproof Waterproof just take the water flowing in the bath The water pipe bursts, no matter how good the waterproof is, it is in vain My sister's faucet is broken, and the floor drain is bouncing and pressed, so much water waterproof pipe is used?? The living room is all water, unless the bathroom is made into a large swimming pool.

  11. Anonymous users2024-01-13

    Yes, first lay cement, then lay the waterproofing layer, and then lay the cement in the brick.

Related questions
1 answers2024-01-27

Are you asking about the implementation time of JGJ298-2013 "Technical Regulations for Residential Indoor Waterproofing Engineering"? >>>More

5 answers2024-01-27

The supervision of Xiaomi's home decoration reminds you that the waterproof construction of the bathroom must be installed and implemented in the waterproof construction specification to reduce the trouble of water leakage and water seepage in the bathroom in the future. The waterproof height of the toilet can be determined according to the specific needs of the user. >>>More

10 answers2024-01-27

If you're worried about water leakage, the most direct way is to test the water. If there is a water mark on the root of the pipe, it must be that he didn't wrap the pipe for you, or he didn't make it tight. If you want to paint yourself, you can buy some polyurethane, but you don't use much of that, and most of it is sold in barrels. >>>More

1 answers2024-01-27

The bathroom is too small" is really a headache for many people when decorating. Toilets, washstands, shower curtain mirror cabinets, corner storage racks, towel racks, all have to be stuffed in. Think about it, you have to have a 10, right? >>>More

8 answers2024-01-27

Toilet waterproofing practices:

Basic material selection: new waterproof materials such as cement mortar, old ones such as acrylic are commonly used toilet waterproof materials. We should choose based on the principles of easy construction, environmental protection and good quality. >>>More