When to do waterproofing in the bathroom, what to do

Updated on Bathroom 2024-01-27
6 answers
  1. Anonymous users2024-01-23

    Bathroom

    Waterproof practices

    1. Waterproof coating for toilets

    1. Waterproof with paint

    The toilet space of ordinary residential buildings is narrow, and there are pipelines passing through the floor slab, etc., so coatings are commonly used for waterproofing.

    Membrane waterproofing is rarely used.

    2. Two kinds of waterproof coatings for toilets

    Nowadays, the materials used for waterproofing are generally paints, and asphalt-based waterproofing coatings are basically not used. Here are two coatings commonly used for waterproofing in the bathroom.

    1) Synthetic polymer polyurethane waterproof coating (polyester cloth and glass fiber cloth are added to corners, etc.).

    (2) SBS waterproof coating of polymer modified asphalt (carcass reinforcement material polyester cloth, glass fiber cloth, etc. is required).

    Second, the toilet waterproof practice

    1. The ground before the waterproof treatment of the bathroom.

    Leveling

    The ground is facing the floor drain.

    Direction to find slope, cement.

    mortar or bean stone concrete.

    Yes, but the surface should be flat. Door.

    The slope near the mouth is small, and the slope near the floor drain is large, so it can be grasped according to the specific situation. The ground is uneven, and it may be uneven when applying waterproof coating, or the ground is easy to crack because of unevenness, which will crack with the ground even if the waterproof paint is applied.

    2. Strengthen waterproofing at the root of the pipeline

    The pipeline passes through the root of the floor slab to strengthen the waterproofing. After the pipe root building sealing paste is sealed tightly, and the cement is smoothed and the foot pads are smoothed, the glass wire cloth reinforcement layer is 1 or 2 layers when brushing the waterproof coating. The same measures are taken near the floor drain.

    3. Waterproof wall treatment in the bathroom

    The wall surface is clean and flat, without floating ash and small particles, and the original corner or slope angle is wiped at the junction of the wall and the ground. When brushing waterproof coating, paste 1 2 layers of glass wire cloth reinforcement.

    4. The thickness of polyurethane waterproof coating film

    The total thickness of the polyurethane waterproof coating film is required to be more than millimeters, which cannot be determined by the number of passes. The pipe root and the corner of the reinforcing layer are brushed first, and after the surface is dried at room temperature for 4h, then a large area is brushed and scraped, and there shall be no leakage and bubbling, and the next layer is painted after 24h curing after large-scale brushing.

    5. Waterproof painting of the bathroom

    6. Requirements for waterproof floor painting in the bathroom

    The waterproof layer on the ground should be painted 300 wide outside the bathroom door. The waterproof floor waterproof layer should be 200 meters higher than the ground, and the wall waterproof layer of the bathroom with shower should be 1800 meters higher than the ground (L8 recommends waterproofing the full wall).

    Waterproofing materials for toilets

    Toilet waterproofing specifications

    Bathroom waterproofing precautions

    Bathroom waterproofing material price

    Toilet waterproofing material brand

  2. Anonymous users2024-01-22

    The waterproofing of the bathroom can be done after running the hydropower line, that is to say, after the water and electricity are completed, after the water and electricity tank is smoothed with plaster, you can use a roller brush to dry the waterproof paint evenly on the wall and the ground, especially the corners must be brushed with more pipes, and more brushes should be brushed around, and wait until 24 hours later. It feels like it's dry, brush it a second time. Generally, the waterproof paint should be brushed twice, to three times, that is, the thickness of the wall should be hit to a millimeter, and the ground should reach a thickness of one millimeter, which is still okay.

  3. Anonymous users2024-01-21

    Decoration must not only care about the shape, the good-looking skin is very simple, and the quality of construction is the last word, such as the waterproofing of the bathroom, the top priority.

    If you don't want the downstairs neighbor to knock on your door after moving in, hurry up and take a look at how to do this bathroom waterproofing.

    Ground treatment: 1. Brush the waterproof paint for the first time. Before construction, ensure that the construction site is clean and dry, and the waterproof coating should be coated with no omission, firmly combined with the base layer, no cracks, no bubbles, and no falling off. The coating height is consistent, and the thickness should meet the requirements of the product.

    PS: Floor drains, wall corners, pipe heels and other joints should be painted with high elasticity and flexible waterproofing, because the joints between the wall and the floor of the bathroom will be displaced and are most likely to seep water.

    2. Brush the waterproof paint for the second time. Note that there needs to be a certain time interval between the second waterproof coatings, and the second pass can only be carried out after the paint is dry, and the specific time depends on the coating. If the interval is too short, the waterproof effect will be greatly reduced.

    3. Lay a protective layer. In order to prevent the subsequent construction from damaging the waterproof layer, it is necessary to lay a protective layer on the surface of the waterproof coating. The protective layer should be completely covered with the waterproof layer, no omission, firmly combined with the base layer, no cracks, no bubbles, and no falling off.

    4. Closed water test. During the closed water test, the waterline at the ground point should not be less than 2 cm, and it should be stored for at least 24 hours, and it should be qualified only after observing that there is no leakage. If there is a leak, it needs to be redone, and you must not be negligent.

    PS: How to do the closed water test.

    1.Plug the floor drain.

    2.Make a water barrier at the door of the bathroom.

    3.Avoid direct contact with the ground when releasing water, and remember to cushion.

    4.The waterline should not be lower than 2 cm, and it should be marked.

    5.Keep it for at least 24 hours and go downstairs to see if there is any leakage (say hello to your neighbors in advance).

    6.Don't be too troublesome.

    Wall Treatment: 1If the bathroom has a shower room, the waterproof should be 180cm, and if there is a bathtub, the waterproof height of the wall adjacent to the bathtub should be 30cm higher than the bathtub

    2. After the waterproof layer is done, a certain amount of time should be left to make the waterproof layer better integrated with the building, and then the protective layer on the waterproof layer and then paved with floor tiles.

    4. Waterproofing is a systematic project, and the causes and treatment methods are different in each place. Materials are the foundation, construction is the key, and follow-up service is the guarantee.

  4. Anonymous users2024-01-20

    Bathroom waterproofing practices What is it, how to do the bathroom waterproofing, how to do the bathroom waterproofing, these issues are more concerned about the owners. Tuba Rabbit will solve your doubts and introduce the practice of bathroom waterproofing.

    1. Waterproof coating for toilets

    1. Waterproof with paint

    The toilet space of ordinary residential buildings is narrow, and there are pipelines passing through the floor slab, so the coating is commonly used for waterproofing and the membrane is rarely used for waterproofing.

    2. Two kinds of waterproof coatings for toilets

    Nowadays, the materials used for waterproofing are generally paints, and asphalt-based waterproofing coatings are basically not used. Here are two coatings commonly used for waterproofing in the bathroom.

    1) Synthetic polymer polyurethane waterproof coating (polyester cloth, glass fiber cloth, etc. are required for corners, etc.).

    2) SBS waterproof coating of polymer modified asphalt (need to add carcass reinforcement materials, polyester cloth, glass fiber cloth, etc.).

    Second, the toilet waterproof practice

    1. Ground leveling before waterproof treatment of the bathroom

    The ground is oriented to the slope of the floor drain, cement mortar or bean stone concrete can be used, but the surface should be flat. The slope near the door is small, and the slope near the floor drain is large, so you can grasp it according to the specific situation. The ground is uneven, and it may be uneven when applying waterproof coating, or the ground is easy to crack because of unevenness, which will crack with the ground even if the waterproof paint is applied.

    2. Strengthen waterproofing at the root of the pipeline

    The pipeline passes through the root of the floor slab to strengthen the waterproofing. After the pipe root building sealing paste is sealed tightly, and the cement is smoothed and the foot pads are smoothed, the glass wire cloth reinforcement layer is 1 or 2 layers when brushing the waterproof coating. The same measures are taken near the floor drain.

    3. Waterproof wall treatment in the bathroom

    The wall surface is clean and flat, without floating ash and small particles, and the original corner or slope angle is wiped at the junction of the wall and the ground. When brushing waterproof coating, paste 1 2 layers of glass wire cloth reinforcement.

    4. The thickness of polyurethane waterproof coating film

    The total thickness of the polyurethane waterproof coating film is required to be more than millimeters, which cannot be determined by the number of passes. The pipe root and the corner of the reinforcing layer are brushed first, and after the surface is dried at room temperature for 4h, then a large area is brushed and scraped, and there shall be no leakage and bubbling, and the next layer is painted after 24h curing after large-scale brushing.

    5. Waterproof painting of the bathroom 6. Requirements for waterproof floor painting in the bathroom

    The waterproof layer on the ground should be painted 300 wide outside the bathroom door. The waterproof floor waterproof layer should be 200 meters higher than the ground, and the wall waterproof layer of the bathroom with shower should be 1800 meters higher than the ground (L8 recommends waterproofing the full wall).

    Waterproofing materials for toilets

    Toilet waterproofing specifications

    Bathroom waterproofing precautions

    Bathroom waterproofing material price

    Toilet waterproofing material brand

  5. Anonymous users2024-01-19

    After walking the water and electricity heating, start to do waterproofing.

    The waterproof height of the bathing wall is meters, and the other walls are meters, and the ground is all done.

    In particular, sewer pipes and floor drains are the focus.

    After the waterproofing is done, a 48-hour closed water test should be done.

  6. Anonymous users2024-01-18

    1. Bathroom waterproof construction steps.

    Step 1: You can use a slightly coarser cement to base the foundation first, and then brush the waterproof paint after the cement is dry. But in painting money, the ground should be flat and there should be no grooves. Water is then sprinkled on the ground to expel the gas from the small holes.

    Step 2: Mix the powder and liquid material evenly, and brush the bubbles if there are bubbles when brushing the paint.

    Step 3: When brushing the paint, brush it from the same direction, wait 1-2 hours, and then brush the second coat. When brushing the second layer, the direction of the brush should be opposite to that of the first layer, so that the best coverage can be achieved.

    Step 4: You can brush it several times, which can increase the density and fill the gaps. Some people think that the more layers of waterproof paint the better, or even brush six or seven layers, but in fact, this is not good, the paint is too thick and easy to crack.

    Step 5: Wait for one day before taking a waterproof test.

    Step 6: When doing the waterproof test, you should first fight with your downstairs neighbor.

    Say hello, then plug the drain, fill the ground with water, and wait an hour to ask your downstairs neighbor if there is a leak. If there is a water leak, the waterproofing layer should be rebuilt. If the waterproof test is qualified, it can be tiled.

    2. Precautions for waterproofing in the bathroom.

    1. In order to ensure that the bathroom floor is flat, it must be leveled with cement mortar, and then waterproof, so as to avoid leakage caused by uneven thickness of waterproof coating.

    2. After leveling, when carrying out the construction of the waterproof layer, it is necessary to pay attention to fire prevention and waterproofing.

    3. When doing waterproof construction, the floor drain, pipeline, and wall hole should be carefully inspected, and the root of the pipeline must be caulked according to the requirements during construction. 4. The waterproof treatment of the wall should also be noted, if the wall and the bathtub are adjacent, then the waterproof treatment height should be higher than the upper edge of the bathtub, and the shower should reach a height of 180cm.

    5. Before doing waterproofing, pay attention to the correct position of the floor drain elevation.

    6. To ensure that the sewer is smooth, the sewer pipes in the bathroom, including floor drains and toilet sewer pipes, must be kept unobstructed.

Related questions
1 answers2024-01-27

Are you asking about the implementation time of JGJ298-2013 "Technical Regulations for Residential Indoor Waterproofing Engineering"? >>>More

5 answers2024-01-27

The supervision of Xiaomi's home decoration reminds you that the waterproof construction of the bathroom must be installed and implemented in the waterproof construction specification to reduce the trouble of water leakage and water seepage in the bathroom in the future. The waterproof height of the toilet can be determined according to the specific needs of the user. >>>More

8 answers2024-01-27

Toilet waterproofing practices:

Basic material selection: new waterproof materials such as cement mortar, old ones such as acrylic are commonly used toilet waterproof materials. We should choose based on the principles of easy construction, environmental protection and good quality. >>>More

10 answers2024-01-27

If you're worried about water leakage, the most direct way is to test the water. If there is a water mark on the root of the pipe, it must be that he didn't wrap the pipe for you, or he didn't make it tight. If you want to paint yourself, you can buy some polyurethane, but you don't use much of that, and most of it is sold in barrels. >>>More

10 answers2024-01-27

It's best not to do it yourself, if you don't do it well, it's troublesome, you can ask a better construction team to help you get it, Guoerjia's construction qualification seems to have won the country's best qualification award, I hope it will help you.