The back wall of the new floor of the bathroom is still the back of the new wall

Updated on Bathroom 2024-03-25
1 answers
  1. Anonymous users2024-01-23

    Make the wall first and then the floor, so as to avoid damage to the secondary finished product.

Related questions
16 answers2024-03-25

First, the force of the bathroom wall after pasting >>>More

2 answers2024-03-25

It should be the wall first, then the ground, and then the wall. >>>More

7 answers2024-03-25

If the floor tiles near the pool are releasing some deep water, it may be that the ground is too wet, or that there is some congestion, or that the sewers are a little blocked.

1 answers2024-03-25

The bathroom belongs to water, and behind the bedside wall is the bathroom with wooden drainage, so it can be resolved by putting green plants near the bed.

2 answers2024-03-25

Individuals are inclined to go to the ground with water pipes: >>>More