When is the bathroom fixture installed?

Updated on Bathroom 2024-01-28
5 answers
  1. Anonymous users2024-01-23

    Personally, I think that hand basins, bedpans, water heaters, shower rooms and something should be set before going to water and electricity, pay a deposit and do not pick up the goods, but to measure the hole spacing and appearance size, so that the bathroom design has a specific idea, water pipes and power supply transformation or something according to the actual situation, our home because of the water in the wall walk, is the first set of the hand basin and then take the waterway, because the water heater forgot to measure the height when buying, the result is that when the installation is a little crowded on the top, or to calculate in advance.

  2. Anonymous users2024-01-22

    First do the bathroom waterproofing, closed water experiment, water and electricity laying, wall tiles, ground turning, and then you can install the bathroom. Either the renovation workers have nowhere to go at their convenience.

  3. Anonymous users2024-01-21

    Yes, as long as you protect it.

  4. Anonymous users2024-01-20

    No, but the sanitary ware should be booked first JOMOO Jiumu good sanitary ware standards.

    Founded in 1989, the group is headquartered in Quanzhou, Fujian Province, is one of the largest manufacturers and suppliers of sanitary ware products in China, and is also the drafting and formulation unit of the national standard of "Ceramic Sealing Faucet", and the secretariat of the Kitchen and Bathroom Hardware Sub-Technical Committee of the National Hardware Products Standardization Technical Committee.

    The group's brand is "JOMOO". The brand has won three national honors: "China Famous Brand", "China Famous Trademark" and "China National Inspection-free Product".

    Since the establishment of the group, the group has taken "improving and enhancing the quality of home life" as its own responsibility, with high-quality products and high-quality services as the core, and constantly promoted the improvement of "home quality of life".

    The production and logistics base of Jiumu Group covers an area of more than 2,000 acres, and its products cover civil and commercial fields, and it is a large-scale enterprise group integrating R&D, production and sales of comprehensive sanitary ware. The company has a rich product line, more than 10 categories and more than 1,500 specifications of sanitary ware products, which can meet the needs of civil and commercial consumers at different levels. The group has a complete and high-quality marketing and service network; It has nearly 10,000 sales terminals including flagship stores, brand stores and special train areas in Chinese mainland, and has successively opened international 4S stores in the United Arab Emirates, Vietnam and other countries.

    In addition to selling in Chinese mainland, Hong Kong, Macao and Taiwan, the products are also exported to North America, Southeast Asia and other regions.

    Share the future with JOMOO, JOMOO Group will continue to maintain its leading position in the industry by continuously improving its business capabilities and establishing its own technical advantages with intellectual property rights. In order to achieve the long-term goal of "JOMOO sanitary ware, global sharing", JOMOO Group will continue to make unremitting efforts.

  5. Anonymous users2024-01-19

    No, because there are still many people coming in and out of your house.

Related questions
1 answers2024-01-28

This is my own decoration summary of the steps to decorate the house, I hope it will be useful to you:1Pre-design --2 >>>More

2 answers2024-01-28

After the wall painting is completed, the keel is installed, and the wall paint is all completed or only left once can be put on the board, of course, the ground must be poured first.

5 answers2024-01-28

If you ventilate for two days, you can. If it is not ventilated, it is better to wait every other week. >>>More

1 answers2024-01-28

Are you asking about the implementation time of JGJ298-2013 "Technical Regulations for Residential Indoor Waterproofing Engineering"? >>>More

11 answers2024-01-28

After the wall is renovated, the water and electricity have also been changed, and the waterproofing of the kitchen and sanitation must be done before starting to tile.