When was the ceiling installed?

Updated on Suspended ceilings 2024-01-27
2 answers
  1. Anonymous users2024-01-23

    After the wall painting is completed, the keel is installed, and the wall paint is all completed or only left once can be put on the board, of course, the ground must be poured first.

  2. Anonymous users2024-01-22

    First find a cabinet company to measure, out of the drawings to determine, and then install the ceiling, ceiling and tiles, etc., the cabinet company retest, and then process and install. The overhead integrated ceiling tells you.

    Hydropower installation approaches.

    Masons can enter the site (the masonry can measure the design drawing after the completion of the ceiling), the carpenter can enter the site (the ceiling and carpentry can be at the same time, and the installation only takes one day) and the painter can enter the site.

    Lamps. Home. Household appliances are admitted.

    The joy of housewarming.

Related questions
7 answers2024-01-27

Generally, there are no guests, and there is no need to open the light strip, so you can install the downlight on the ceiling. >>>More

1 answers2024-01-27

If there is no agreement to use eco-friendly paint, it is suitable to move in after two months at the earliest. I hope my answer can help you.

2 answers2024-01-27

One month before the installation of the solid wood composite door, you need to make an appointment for measurement, because the production of solid wood composite door is many days, plus intermediate transportation, so you have to measure one month in advance.

1 answers2024-01-27

Before the gypsum line is whitened, other materials must also be made last before the white, and there will be some small gaps when installed, which can be repaired. Dabai completed the operation in the installation is not good.

4 answers2024-01-27

The part of the first floor is very reasonable, but it also depends on the door you buy Because the finished door is also divided into door sleeves and those without door sleeves If it is with a door sleeve, it will be installed after the carpentry is basically over, but the door cover must be installed first Because the size of the door hole must be wrong, so it needs to be repaired. >>>More