Is it necessary to do waterproofing in the bathroom? Do you know the waterproof process?

Updated on Bathroom 2024-10-06
1 answers
  1. Anonymous users2024-01-24

    Hydropower installation must go on the wall, after the installation in the construction waterproofing, drainage and waterproofing combined, first around the pipe mouth, flue side foot, and hollow shell parts chiseled about 3--4cm deep, and then sealed with the plugging king flat, cleaned up fully and dry, and then used K11 waterproof paint to paint 4 ways, each of which is required to be painted after the upper coating film is dried and filmed, and the cross brush method construction is required, after the completion of the coating construction, wait until 36 hours, hard work, and then carry out the water storage test, in general, It can be foolproof.

Related questions
1 answers2024-10-06

This resolutely does not work, you must wait for the waterproof layer to completely dry, and then carry out a closed water test to ensure that there is no leakage, before you can start tiling, and in the process of tiling, you must ensure that there is no damage to the waterproof layer. The so-called closed water test refers to the toilet waterproof layer is completed and dry, the floor drain on the bathroom floor, the nozzle and other drainable pipes are sealed with tape to ensure that there will be no water leakage, and the water surface of the bathroom begins to release water, the height of the control principle is that the water surface must be higher than the upper mouth surface of the floor drain and must ensure that the floor of the bathroom can be immersed in water, so that you can see whether there is a leakage problem in the bathroom downstairs, and the water storage time is at least 24 hours or more.

2 answers2024-10-06

It doesn't matter what type of waterproof bathroom do, it is important to do closed water experiments, he does not leak, as long as it does not leak, the tiles are funnel type in the future, so that the water will easily flow into the floor drain, hehe I wish you a happy decoration.

6 answers2024-10-06

It should be possible! Now why 50% of the waterproof buildings are leaking, one of the points is not to pay attention to the protection of the finished product, even if your waterproof material is good, the construction quality is high, after the finished product protection is not in place, it still leaks. Therefore, during the construction of the waterproof layer and after the construction is completed, we must pay attention to the protection of the finished product, and the situation you said should be more responsible for the construction party.

2 answers2024-10-06

Bathroom waterproof construction height: 30CM up to the corner of the wall, 180CM height at the shower, 100CM at the basin. Pay attention to the last time the wall waterproofing and floor waterproofing are done (a total of 2 layers need to be done), and do not leave construction joints in the corners of the wall (that is, do construction pauses and intervals). >>>More

1 answers2024-10-06

Toilet waterproofing practices:

1. Ground treatment. >>>More