Is it OK to do this for bathroom waterproofing?

Updated on Bathroom 2024-08-25
6 answers
  1. Anonymous users2024-01-24

    It should be possible! Now why 50% of the waterproof buildings are leaking, one of the points is not to pay attention to the protection of the finished product, even if your waterproof material is good, the construction quality is high, after the finished product protection is not in place, it still leaks. Therefore, during the construction of the waterproof layer and after the construction is completed, we must pay attention to the protection of the finished product, and the situation you said should be more responsible for the construction party.

  2. Anonymous users2024-01-23

    You can check the construction standards on the Internet!!

    It's very comprehensive on the Internet, and it's impossible to say.

    Suggested read: "Waterproof Portal" website is: 91fangshui

  3. Anonymous users2024-01-22

    First do waterproofing and then paving floor tiles first paving floor tiles and then waterproofing may not have leaked at that time, but after a while (after you use it for a period of time) there is a leak downstairs!!

  4. Anonymous users2024-01-21

    There is no problem at all, the bottom layer is not sticky when sticking wall tiles, and it can be rolled up 30 cm when doing ground waterproofing, in fact, the normal practice should be to do the wall and ground together, and then do the protective layer, you save the process of the protective layer.

  5. Anonymous users2024-01-20

    Yes, this is done to protect the waterproofing on the ground from being damaged during the construction process, because sometimes the masons cut the tiles on the waterproof layer after the waterproofing is done, and throwing tools can easily lead to the destruction of the waterproof layer, and the waterproof effect cannot be achieved.

  6. Anonymous users2024-01-19

    Your bathroom waterproofing should be used paint or mortar, basically there is no big problem, because the bottom of the tile on the wall is not pasted first, and so the top is all pasted, and the ground is waterproof, to the wall back to the height and the previous waterproof layer combined, and finally paved the ground and the bottom of the wall around the tiles.

Related questions
2 answers2024-08-25

Several indispensable steps for decorating the bathroom to do waterproofing must not be ignored. >>>More

2 answers2024-08-25

It is a human thing, how much will be unsatisfactory, and whether the water leaks in the later stage depends on your actual use and how to maintain it in the later stage.

1 answers2024-08-25

No. I use Golga's regular waterproof paint and reinforced polyester cloth.

2 answers2024-08-25

You don't have a map of the overall location of the house, and it's okay to judge based on this alone. But pay attention to the sewer pipes, try to separate as much as possible, hygiene is important. >>>More

5 answers2024-08-25

Bathrooms must be waterproofed. To do waterproofing, it is necessary to solve the waterproofing of the ground to prevent water leakage into the substructure, and to solve the waterproofing of the wall to prevent water from leaking to the other side of the same wall. If it is divided into dry and wet areas, the wet area is generally meters, and the dry area is 20-30 cm. >>>More