There is a large kitchen project, the hood is 14 5 meters long and 1 2 meters wide, and the pipe is

Updated on Kitchen 2024-10-04
1 answers
  1. Anonymous users2024-01-24

    1. Exhaust air volume:

    One of the long sides of the smoke exhaust hood is against the wall, and the smoke exhaust hood is 06m away from the stove mouth, and the minimum air volume required is calculated by calculating: 31320m3 h;

    2. Elbow resistance = 19 * 4 = 76Pa

    3. Straight pipe resistance =

    4. Select the fan: Taiwan).

    6. None of the above items do not include kitchen ventilation air volume and fresh air volume.

Related questions
2 answers2024-10-04

The most critical fan air volume has not been given and cannot be calculated. You tell me to do the math for you.

1 answers2024-10-04

The design of the kitchen project must pay great attention to the effective coordination and coordination of the overall functional planning of the kitchen, environmental protection and energy saving, fire safety, health and epidemic prevention, and kitchen ventilation system. In the layout of the master plan, the impact of fumes, odors, noise, and waste from the kitchen on the adjacent buildings should be prevented [68]. "Separation of people flow and logistics" and "one-stop production of raw and cooked" are the most basic principles of the overall design of the kitchen. >>>More

1 answers2024-10-04

I don't know how thick the board you want to use, it's not good to calculate how much it is, a single cut is 5 yuan a knife,

1 answers2024-10-04

How big is your kitchen and are there any drawings? Jinhua Kitchenware Factory, I hope to help you.

4 answers2024-10-04

First of all, this issue is usually Party A is responsible for coordination, but you said that your contract does not write which party will coordinate when there is a dispute, which makes Party A take advantage of the loophole, do you see that there is a detailed construction plan and construction drawings or planning drawings on the construction organization design signed by Party A? If there is, you will find Party A, you say that you have signed and agreed to our plan, and now the situation belongs to the construction environment does not meet the requirements of the construction, and the construction party requires Party A to coordinate (because Party A has the obligation to provide the necessary construction environment for the construction party), anyway, you will find a way to find evidence that Party A has agreed to your construction plan, which is used to increase the weight of negotiation. If there is no construction organization design or planning diagram, then the problem is more troublesome, because Party A will say that your construction process is problematic, and ask you to choose other construction methods, or other pipeline paths (you know this is impossible). >>>More