-
First of all, this issue is usually Party A is responsible for coordination, but you said that your contract does not write which party will coordinate when there is a dispute, which makes Party A take advantage of the loophole, do you see that there is a detailed construction plan and construction drawings or planning drawings on the construction organization design signed by Party A? If there is, you will find Party A, you say that you have signed and agreed to our plan, and now the situation belongs to the construction environment does not meet the requirements of the construction, and the construction party requires Party A to coordinate (because Party A has the obligation to provide the necessary construction environment for the construction party), anyway, you will find a way to find evidence that Party A has agreed to your construction plan, which is used to increase the weight of negotiation. If there is no construction organization design or planning diagram, then the problem is more troublesome, because Party A will say that your construction process is problematic, and ask you to choose other construction methods, or other pipeline paths (you know this is impossible).
The next time you sign a contract, you must pay attention to this aspect, I hope it can help you.
-
Party A is responsible, if it cannot coordinate the payment of materials and construction costs according to Party A, it has nothing to do with Party B.
-
This issue is generally coordinated by Party A, but it depends on how your contract is written.
Looking at the situation of Party A you said, it is estimated that you have been fooled, so discuss how to deal with it.
You must pay attention to the next time you sign a contract, I hope you can get RMB.
-
Find Party A as a sta.
If it's groundwater, it's a pipe mouth. It depends on where your pure water source is, whether it is groundwater or not.
If two different water qualities are supplied directly from the plant, two separate water supply pipes will be required to enter the building. >>>More
It is difficult for a person, even if he exercises regularly, but the sofa volume is there, and the corridor in my country is not very wide. >>>More
Optical band refers to bai in band and flexible.
The specially processed copper wire on the dulu slab is welded to the zhiLED light, because it looks like a light strip when the dao is turned on. >>>More
You're on the second floor and customers can't see you.
So you have to be proactive and let customers see you. >>>More