The bathroom is plastered with wall tiles but the floor tiles are not paved, can it still be done wa

Updated on Bathroom 2024-10-02
3 answers
  1. Anonymous users2024-01-24

    Use flexible waterproof coatings to do ground waterproofing, and it is recommended to remove the last row of wall tiles on the lower layer of the wall, and remove the wall tiles from the ground waterproofing wall. And then subsidize the wall tiles. If you have the conditions to buy imported tile waterproof caulk, make the wall tile gaps.

  2. Anonymous users2024-01-23

    You need to kick off the bottom row of wall tiles, do a good job of waterproofing, and then paste it.

  3. Anonymous users2024-01-22

    In this case, it can only be waterproofed on the ground.

Related questions
3 answers2024-10-02

First the wall, then the ground. Because there is a floor drain in the bathroom, if you want to do the slope, you should do the ground first, and the wall tiles will not be flat.

9 answers2024-10-02

For bathroom decoration, the first to lay the floor tiles or the first to lay the wall tiles, which needs to be decided by the residents according to the specific situation of the home decoration bathroom, mainly whether the paving of floor tiles or wall tiles is conducive to the previous construction of the project for reasonable protection, so as not to cause damage to the construction projects installed before, such as circuits, waterways, etc. >>>More

6 answers2024-10-02

One point to do waterproofing, unless your home is on the first floor, you don't have a basement yet, otherwise, you wait to quarrel with the downstairs!!

19 answers2024-10-02

To do waterproofing, you need to do ground treatment, wall treatment and other processes need to be done. >>>More