-
Yes, it is generally in order from the inside to the outside (that is, it is posted at the door last).
-
Generally, the kitchen should be measured, and the kitchen cabinet should be customized, and the time to make it is relatively long, so it should be pasted first.
-
Generally, the wall tiles are pasted first, and it doesn't matter where the floor tiles are pasted first.
-
Depending on the conditions, it generally starts from the lobby
If the balcony is closed, it is better to tile it.
After sealing the balcony, the balcony should be pasted, and a slope paste should be made, so as to ensure that there is no water leakage, otherwise it may leak.
Balcony tiles do have many benefits, first of all, there is a waterproof effect, so that the ground, the wall will not be moldy, black, and it is easier to clean. >>>More
Generally, it will not fall, as long as it is firmly pasted, do not paste tiles in the rainy season and winter, preferably in autumn.